Orange County NC Website
7 <br />6.Fee <br />A.The following fees are intended to replace all design fees(with the exception of the <br />Preliminary Studyfee)provided on our original proposal dated March 1, 2016. <br />EAC Building (Conventional) <br />Schematic Design$46,970 <br />Design Development$65,990 <br />Construction Documents$95,230 <br />Bidding$10,180 <br />Construction Administration$87,500 <br />Closeout$11,580 <br />Subtotal$317,450 <br />Park Ops Building (Pre-Engineered) <br />Schematic Design$18,800 <br />Design Development$24,900 <br />Construction Documents$36,100 <br />Bidding$6,300 <br />Construction Administration$32,100 <br />Closeout$7,100 <br />Subtotal$125,300 <br />Site/Civil Engineering <br />Schematic Design$9,200 <br />Design Development$18,400 <br />Construction Documents$25,300 <br />Bidding$4,600 <br />Construction Administration$13,800 <br />Closeout$4,600 <br />Subtotal$75,900 <br />Total Basic Design Fee$518,650 <br />Additional Services (if requested) <br />Security System Design$4,600 <br />Site Lighting Design$4,600 <br />*Note: Thefees detailed above are not intended to be “a la carte”and are broken up purely for <br />informational purposes. <br />DocuSign Envelope ID: 7B8562A0-AFF8-46FE-BD6D-399B7C6FD049