Browse
Search
2018-523-E AMS - HH Architecture contract amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-523-E AMS - HH Architecture contract amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:57:39 PM
Creation date
8/31/2018 4:32:37 PM
Metadata
Fields
Template:
Contract
Date
8/20/2018
Contract Starting Date
4/5/2016
Contract Ending Date
3/31/2021
Contract Document Type
Contract Amendment
Amount
$554,450.00
Document Relationships
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
R 2018-523 AMS - HH Architecture contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />6.Fee <br />A.The following fees are intended to replace all design fees(with the exception of the <br />Preliminary Studyfee)provided on our original proposal dated March 1, 2016. <br />EAC Building (Conventional) <br />Schematic Design$46,970 <br />Design Development$65,990 <br />Construction Documents$95,230 <br />Bidding$10,180 <br />Construction Administration$87,500 <br />Closeout$11,580 <br />Subtotal$317,450 <br />Park Ops Building (Pre-Engineered) <br />Schematic Design$18,800 <br />Design Development$24,900 <br />Construction Documents$36,100 <br />Bidding$6,300 <br />Construction Administration$32,100 <br />Closeout$7,100 <br />Subtotal$125,300 <br />Site/Civil Engineering <br />Schematic Design$9,200 <br />Design Development$18,400 <br />Construction Documents$25,300 <br />Bidding$4,600 <br />Construction Administration$13,800 <br />Closeout$4,600 <br />Subtotal$75,900 <br />Total Basic Design Fee$518,650 <br />Additional Services (if requested) <br />Security System Design$4,600 <br />Site Lighting Design$4,600 <br />*Note: Thefees detailed above are not intended to be “a la carte”and are broken up purely for <br />informational purposes. <br />DocuSign Envelope ID: 7B8562A0-AFF8-46FE-BD6D-399B7C6FD049
The URL can be used to link to this page
Your browser does not support the video tag.