Browse
Search
Agenda - 12-04-2000-8q
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 12-04-2000
>
Agenda - 12-04-2000-8q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:46:10 PM
Creation date
8/29/2008 10:17:16 AM
Metadata
Fields
Template:
BOCC
Date
12/4/2000
Document Type
Agenda
Agenda Item
8q
Document Relationships
Minutes - 12-04-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Edward Battle <br />517 Hillsborough St. <br />94z-5448 <br />9/12/00 <br />EXTERIOR: <br />1. Remove the steps up to the front yard. Install steps and handrails of pressure <br />treated lumber. <br />2. Remove the steps to the front porch, Install steps and handrails of pressure treated <br />lumber. Paint the handrails on the front porch. Paint to cover completely. <br />3. Remove the front and rear porch roofs and framing. <br />4. Reframe the front porch roof so that the new pitch is not less than a 4x12 pitch. <br />Install a 2xb header. Install'/z inch plywood, 1x6 fascia, and 12-inch soffitt. <br />Insta112x6 rafters. <br />5. Reframe the back parch roof so that the new pitch is not less than a 4x12 pitch. <br />Install 2x6 header. Install %z inch plywood, lxb fascia and 12-inch soffitt. Install <br />2x6 rafters. <br />6. Remove all trash and debris from the left and right side, back Yazd and from under <br />the porch. <br />7. Install vinyl siding and trim. Install vinyl, vented soffit and trim. Fur the windows <br />to accept J channel for the siding. Wrap the fascia and all window and door trim <br />with aluminum coil stock. Install siding on both porch ceilings. Wrap the headers <br />in aluminum coil stack. <br />ROOF: <br />1. Remove the roof covering to the sheathing. <br />2. Replace approx. 2001.f. of 1x6 sheathing. <br />3. Install 151b. felt, aluminum drip edge, three tab, twenty-yeaz shingles and new <br />plumbing boots. Install a shingle type ridge vent ventilation system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.