Orange County NC Website
14 <br />JACOBS <br />LEFT/REAR BEDROOM: <br />1. Install trim for the bifold closet doors. <br />HAIL: <br />1. Replace the pull down, attic access door with an aluminum pull down unit. <br />BATH: <br />1. Install six panel, wood door unit and lockset. <br />2. Prepaze the floor for vinyl. Install vinyl floor covering, shoemold and metal trim. <br />3. Paint the ceiling and trim with semigloss latex paint. Paint to cover completely. <br />KITCHEN: <br />1. Remove the lritchen base cabinets and finish floor. Cover the remaining cabinets <br />with plastic. Replace approx. 64 sq.ft. of subfloor with likesize material. Install %4 <br />inch loan plywood. <br />2. Prepaze the plywood for vinyl. Install vinyl floor covering, shoemold and metal <br />trim. vinyl to cost aot less than $1 Myd <br />3. Paint the ceiling with ceiling white latex paint, the walls, cabinets and trim with <br />semigloss latex paint. Paint to cover completely. <br />