Browse
Search
Agenda 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 09-04-2018
>
Agenda 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:01:19 PM
Creation date
8/30/2018 4:25:31 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El! <br />EXHIBIT 1 of Resolution <br />Example of Inspections Being Required by Orange County <br />Below is the comprehensive list of Inspections Staff is requesting that the Orange County Board of <br />County Commissioners support and accept as policy which will be conveyed to the NC Building Code <br />Council for a request of approval: <br />Deck footing I Modular marriage wall <br />Concrete form I Brick lintel [bolted] <br />Foundation projection Pre -brick / stone veneer <br />Water proofing Temporary electrical [saw service] <br />Masonry fireplace Temporary electrical final <br />Building pre -slab <br />Temporary mechanical final <br />Garage Slab <br />Building floor framing <br />Plumbing in slab <br />Deck final <br />Mechanical in slab <br />Electrical pool bond <br />Electrical in slab I Electrical change of service <br />Electrical in trench I Electrical service relocation <br />Plumbing in trench Factory fireplace <br />Mechanical in trench Restore electrical service <br />Gas pipe in trench Plumbing final <br />Plumbing rough -in Electrical final <br />Mechanical rough -in I Mechanical final <br />Electrical rough -in I Pool final <br />Gas pressure test <br />Requested Inspections: <br />Deck footing: Decks are often built toward the end of a project or by a separate subcontractor. <br />Having a separate inspection allows the Builder to schedule whenever this footing is ready. <br />Concrete form: Formed concrete and pre -cast foundations require additional inspection <br />considerations to accommodate multiple construction sequences and verification of <br />reinforcement or connections that may be in addition to other areas of the building system that <br />have conventional foundation systems. This allows basements to be verified prior to crawl <br />space foundations being ready. <br />
The URL can be used to link to this page
Your browser does not support the video tag.