Orange County NC Website
11 <br />Masonry Fireplace <br />When firebox to the first flue <br />Foundation <br />All prior foundation <br />liner and hearth extension <br />Inspections partially <br />are complete. No Sequence <br />approved, scheduled when <br />firebox to first flue liner is <br />complete. Prior to Framing <br />or Rough -in. <br />Factory Fireplace <br />Stand -alone Mechanical <br />Rough -in <br />Part of the overall Rough -in <br />rough -in. When system is <br />inspection. <br />installed. <br />Gas Pressure test: <br />When piping that will be <br />Rough -in <br />Part of overall Rough -in <br />Rough -in and Final <br />concealed is tested. No <br />Inspection. <br />sequence. <br />Pre - Brick, Pre -Stone <br />Prior to cladding after <br />Building Framing <br />Inspected with Building <br />weather - proofing and <br />Framing. <br />windows /doors installed. <br />Representative pattern of <br />Brick ties, weep flashing and <br />Lath installed with weep <br />screeds for stone veneers. <br />No sequence <br />Brick Lintels <br />Bolted Lintels when installed <br />Building Framing <br />With Building Framing <br />prior to loading with brick. <br />Modular Marriage <br />When sections are joined <br />Building Framing <br />Partial Building Framing <br />wall <br />together <br />approval required. <br />Pool Bond <br />When bonding relating to <br />Rough -in <br />Combined with all Trade <br />swimming pools are <br />Rough -ins <br />complete <br />NFPA 13D sprinkler <br />When designed system is <br />Rough -in. <br />With Trade Rough -in <br />system <br />complete and test provided. <br />Inspections. <br />Maybe part of Plumbing <br />Inspections when a <br />multipurpose system. No <br />other sequence. <br />Pre - Insulation <br />During construction to verify <br />Building Framing <br />With Building Framing <br />air - barrier installation. No <br />Inspection <br />sequence <br />Restore Electrical <br />Maybe scheduled when <br />Final <br />After Insulation approved. <br />Service, Relocate <br />needed. <br />Service, Change -of- <br />service <br />Temporary <br />Application required: After <br />Electrical Final and <br />Both systems are complete. <br />Mechanical and <br />wall finishes and either <br />Mechanical Final <br />Signing application grants <br />Electrical service <br />entire systems are complete <br />authority to perform these <br />or approved partial systems. <br />inspections in addition to <br />Must both be approved for <br />Standard list. <br />release of utility <br />Deck Final <br />When complete, No <br />Final <br />Project complete <br />sequence, or with Building <br />Final. <br />Pool Final <br />When Swimming Pool is <br />Final <br />With Final Inspections <br />complete <br />Consultation <br />No sequence. Brings <br />N/A <br />Inquire when Inspector on <br />Inspector to job site to <br />site for scheduled <br />address questions. <br />inspection only. <br />Partial Inspections <br />Applicant may select to have <br />N/A <br />Must follow schedule, may <br />unique portion of building <br />schedule partials within this <br />inspected to meet <br />schedule to facilitate <br />scheduling needs. <br />technical feasibility issues. <br />