Browse
Search
Agenda 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 09-04-2018
>
Agenda 6-c - Resolution Approving a Policy of Additional Inspections for Residential Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:01:19 PM
Creation date
8/30/2018 4:25:31 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />Historic <br />When Historic <br />EQUIVALENT TO <br />When 8 Required <br />Inspection <br />Inspection <br />NCACP SECTION <br />Inspection are <br />Is scheduled <br />107 8 REQUIRED <br />scheduled <br />INSPECTION <br />Saw Service <br />When Electric is needed for <br />N/A <br />Indicating "Saw Service" on <br />construction. <br />application grants authority <br />to perform this inspection. <br />Building Footing <br />When excavation is <br />Footing <br />When all excavations for <br />complete, may be divided <br />the project site are <br />into sections for phasing. <br />complete. <br />Deck Footing <br />When excavation is <br />Footing <br />With Footing <br />complete for deck /porch: no <br />sequencing. <br />Projection <br />When CMU or forms are <br />Foundation <br />After all excavations for <br />placed upon footing. Only <br />footings are approved: <br />one course of block needed, <br />Foundation is before <br />masons may be working <br />grading either interior or <br />during inspection. N/A <br />exterior <br />concrete forms. <br />Foundation <br />Concrete forms complete, <br />Foundation <br />Concrete forms in- place, <br />crawl space is graded, <br />masonry complete. Partial <br />damp - proofing applied, crawl <br />approval for required Water - <br />drain provided and mud sill <br />Proofing. No grading and <br />placed. <br />NO floor framing permitted. <br />Modular foundation <br />When Pier and tie -downs <br />Foundation <br />When installation is <br />installed for on -frame <br />complete, prior to setting <br />modular buildings <br />the house. <br />Floor Framing <br />May be combined with <br />Building Framing <br />Verified with whole Building <br />foundation. Floor system <br />framing. <br />with point -load blocking, <br />A special Inspection needed <br />multiply members installed <br />for pre -cast foundations to <br />BEFORE sheathing. <br />address floor system to <br />stabilize wall system. <br />Water- Proofing <br />Basement foundations prior <br />Foundation <br />Verified with Foundation <br />to backfill placement <br />Concrete form <br />Used for concrete foundation <br />Foundation <br />Scheduled in partially <br />and reinforced Masonry <br />approved sequences for <br />walls. Maybe scheduled for <br />multiple pours. <br />multiple pours. <br />Building Slab <br />For all structural and non- <br />Under -Slab <br />After Under -Slab inspection <br />structural slabs. After all <br />[Building] <br />approval. <br />trade approvals when and <br />slab is prepared for concrete <br />placement. Multiple may be <br />scheduled for different <br />phases. <br />Garage Slab <br />When slab is prepared for <br />Under -Slab <br />With [Building] Slab. <br />concrete placement. NO <br />[Building] <br />sequence <br />Plumbing, <br />In any sequence when utility <br />Under -slab <br />Prior to Foundation when all <br />Mechanical or <br />system is tested and ready. <br />utilities are under test and <br />Electrical in slab <br />ready. <br />Trenches <br />Plumbing, Mechanical, <br />Rough -in <br />Included in Trade Rough -in <br />Electrical, Gas pipe trench <br />Inspection. <br />inspections maybe <br />scheduled whenever ready, <br />no sequence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.