Browse
Search
Agenda - 09-04-2018 8-j - Request for Road Addition to the State Maintained Secondary Road System for Paper Birch Lane and Greenbrook Lane Lane in Pleasant Green Woods Subdivision Phases 3 and 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 8-j - Request for Road Addition to the State Maintained Secondary Road System for Paper Birch Lane and Greenbrook Lane Lane in Pleasant Green Woods Subdivision Phases 3 and 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:14:16 PM
Creation date
8/30/2018 3:49:19 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-j
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />North Carolina Department of Transportation <br />Division of Highways <br />Secondary Road Addition Investigation Renort <br />County: <br />Orange <br />Co. File No: 0 -17 -04 <br />Date: 06101/18 <br />Township: <br />Eno <br />Div. File No: <br />Div. No: <br />Local Greenbrook Lane <br />Name: <br />0.32 mile 20' <br />Length: <br />Surface <br />Thickness <br />0A <br />Width. <br />Base Type <br />Pleasant Green Woods Phase 4 <br />Subdivision Name: <br />Surface SF9.5A <br />Type: PVIMT Condition: <br />ABC Base 8" <br />Thickness <br />"Retaining <br />Bridges Yes No x * Pipe > 48° Yes No x Walls Within Yes <br />— — — — Right of Way <br />* If Yes - Incliude Bridge Maintenance Investigation Report <br />Is this a subdivision street subject to the construction requirements for such streets? <br />Recording Date: 1/13/16, Book: 115,116 Page: 83,97 <br />3/20/18 <br />Number of homes having entrances into road: 14 <br />Other uses having entrances into road: None <br />If right -of -way is below the desired width, give reasons <br />Right -of -Way Width: 50' under "Remarks and Recommendations." <br />Is petition (SR -1) attached? Yes <br />Good <br />No —x <br />Is the County Commissioners Approval (SR -2) attached? Yes If not, why not? <br />Is a map attached indicating information for reference in locating road by the <br />Planning Department? Yes <br />Cost to place in acceptable maintenance condition: Total Cost: $ <br />Grade, drain, stabilize: $ Drainage: $ Other: $ <br />Remarks and Recommendations: (Meets Requirements. Recommend Addition <br />Submitted by:''` Reviewed and Approved: <br />DISTRICT ENGINEER DIVISION ENGINEER <br />Reviewed and Approved <br />BOARD OF TRANSPORTATION MEMBER: <br />Do not write in this space- For <br />Roads Unit <br />Petition 9 <br />Form SR -4 (11105/07) <br />
The URL can be used to link to this page
Your browser does not support the video tag.