Orange County NC Website
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />q i <br />APPENDIX A <br />Division of Project Cost Elements <br />IX. OTHER COSTS <br />DESCRIPTION <br />BASIC FEE <br />GEN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Project Taxes <br />X <br />Construction Equipment <br />X <br />Construction Labor Costs <br />X <br />Construction Materials <br />X <br />Subcontractor Layout & Staking <br />X <br />Survey Controls and Benchmarks <br />X <br />Cost of Design & Engineering <br />X <br />A/E Cost for Bid Packages <br />X <br />Preliminary Soils Inspections <br />X <br />Title/Development Cost <br />X <br />Land Costs <br />X <br />Financing /Interest Cost <br />X <br />Interim Financing Costs <br />X <br />Owner Change Contingency <br />X <br />Building Operation after Move -in <br />X <br />Building Maint. after Move -in <br />X <br />Moving Coordination <br />X <br />Moving Costs <br />X <br />Corrective Work <br />X <br />Asbestos Abatement <br />X <br />Lead Abatement <br />X <br />C.M. General Overhead Cost <br />X <br />C.M. Profit/Margin <br />X <br />Costs Over GMP <br />X <br />NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 5 of 5 <br />