Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />M <br />ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 3 of 5 <br />APPENDIX A <br />Division of Project Cost Elements <br />VIL PERMITS AND SPECIAL FEES <br />DESCRIPTION <br />BASIC FEE <br />GEN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Storage Yard Rental <br />X <br />Parking Lot Rentals <br />X <br />X <br />Parking Fees <br />X <br />Curb & Gutter Permits <br />X <br />X <br />Sign Permits <br />X <br />X <br />Staking & Layout Fees /Costs <br />X <br />Sidewalk Perm its <br />X <br />X <br />Landscape Permits <br />X <br />X <br />Street/Curb Design Charge <br />X <br />X <br />Building Permits <br />X <br />X <br />Plan Check Fees <br />X <br />X <br />Water Connection Fee* <br />X <br />X <br />Sanitary Connection Fee* <br />X <br />X <br />Storm Connection Fee* <br />X <br />Gas Service Charge* <br />X <br />Power Service Charge* <br />X <br />Special Tap Fees <br />X <br />Contractors' Licenses <br />X <br />Royalties <br />X <br />Zoning Fees /Consultants <br />X <br />Use Fees <br />X <br />A.G.C. Fees <br />X <br />NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />*Represent final connection costs, not temporary. <br />VIII. INSURANCE AND BONDS <br />DESCRIPTION <br />BASIC FEE <br />GEN CONDS. <br />A/E COST <br />OWNER COST <br />COST OF WORK <br />Builder's Risk Insurance * <br />X <br />Designer's Errors and Omissions <br />X <br />General Liability <br />X <br />Completed Operations Liability * <br />X <br />Excess Liability Coverage * <br />X <br />CM Payment Bond * <br />X <br />CM Performance Bond * <br />X <br />Subcontractor Payment Bonds ** <br />X <br />Subcontractor Performance Bonds ** <br />X <br />Subcontractor Payment Bonds using <br />Subguard) ** <br />X <br />Subcontractor Performance Bonds <br />(using Subguard) ** <br />X <br />Off -Site Insurance <br />X <br />Off -Site Taxes <br />X <br />NOTE: ALL PERSONNEL COSTS INCLUDE SALARIES AND APPROVED LABOR BURDEN <br />* Insurance and bonds, while shown under the General Conditions heading, will each be separate NTE reimbursable costs. <br />** If subcontractors are to be bonded, then the CM must determine to use one or the other type of bond. The CM cannot split between the two; for <br />example, use all Subguard or all subcontractor bonds, not part Subguard and part subcontractor bonds. If Subguard is used, it will be a separate NTE <br />reimbursable cost. <br />ORANGE COUNTY DETENTION GENERAL CONDITIONS Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.