Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 04E136D1 -507C- 4219- BF16- 446F8D2192F8 <br />21 <br />B O R D E A U X <br />Construction Company, Inc. <br />June 29, 2018 <br />Mr. Jeff Thompson <br />Director, Asset Management Services <br />Orange County Government <br />jethompson @orangecountync.gov (sent via email only) <br />131 West Margaret Lane <br />Hillsborough, NC 27278 <br />Reference: Orange County Detention Cost Proposal Rev. 5 <br />Dear Jeff, <br />Thank you for the opportunity to provide our revised cost proposal. The fee and GC proposal is based on a budget <br />of $24,400,000 +/- "Orange County Northern Campus Concept" as provided by Civil Consultants and dated <br />February 4, 2018. Scope of work is assumed to include the construction of the proposed 47,000 + /- sf Detention <br />Center, Park Operations Facility, Pole Barn, and associated Storage Yard, and the 17,000 + /- sf Agriculture Building <br />and associated site work. Offsite work including the extension of water /sewer and road widening is also assumed <br />to be in the scope of work. Agricultural skills demonstration, Park Ops Office, geo- thermal, Law Enforcement <br />Center, photovoltaic system, etc. are not assumed to be in the scope of work, but may be incorporated with <br />further study of the project budget. <br />Construction of the proposed Detention project is to be built in an 18 month duration plus an additional month for <br />Final Completion and an additional month for DHSR inspection and punchlist completion for a total of 20 months. <br />Construction of the proposed Agriculture Building is to be built in a 12 month total duration and is assumed to be <br />concurrent with the Detention Center schedule. We offer the following fee proposal for the proposed project: <br />Preconstruction fee: $85,000 <br />General Conditions: $1,184,693 <br />Construction Management Fee: 3.75% <br />General Conditions estimates of the proposed layout and a matrix of general conditions, fee, cost of work, A /E, and <br />owner responsibilities are attached to this proposal. <br />We are looking forward to working with you on the Orange County Detention project. Should you have any <br />questions, please contact me. <br />Very truly yours, <br />Bordeaux Construction Company, Inc. <br />/41�airBorcleaux, P.E. <br />President, Bordeaux Construction Company, Inc. <br />Enclosure <br />135 E. Martin St., Suite 101, Raleigh, NC 27601 <br />(919) 220 -1141 tel (919) 220 -1147 fax <br />www.bordeauxconstruction.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.