Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />7. Excluded Services <br />A. Not required by code, or otherwise not anticipated: <br />1. Rezoning of property <br />2. Chapter 17 special inspections <br />3. Traffic impact analysis <br />4. LEED design and certification <br />B. Provided under separate contract: <br />1. Surveying <br />2. Geotechnical investigations <br />3. Environmental investigations <br />4. Permitting fees <br />5. Hydraulic analysis <br />6. New driveway permit or utility encroachment permit from NCDOT <br />7. Off -site utility design <br />C. Excluded design services, to be billed as Additional Services only if required: <br />General: <br />a. Project scope increase or change <br />b. Design of the additional space beyond what is listed in the programming document <br />c. Design for complex or large -scale bid alternates <br />d. Express review <br />e. Life cycle and operating cost analysis <br />f. Any other service not listed in scope <br />2. Additional Meetings: <br />a. Additional monthly construction meetings beyond the anticipated 10 <br />b. Additional architectural CA visits beyond the anticipated 22 <br />c. Additional MEP CA visits beyond the anticipated 12 <br />d. Additional structural CA visits beyond the anticipated 5 <br />e. Additional site /civil CA visits beyond the anticipated 4 <br />f. Public meeting attendance <br />g. Fundraising meeting attendance <br />3. Additional Architectural Services: <br />a. Renderings for fundraising <br />b. Furniture, Fixtures, and Equipment (FF &E) selection and design <br />c. Site signage design <br />d. Commercial kitchen design, including equipment and walk -in freezers and coolers <br />(warming kitchen is included) <br />4. Additional Site Design: <br />a. Involvement in stormwater runoff management or mitigation issues that may <br />be raised by regulatory agencies beyond typical requirements, due to site - <br />specific characteristics or concerns <br />b. Unusual site work associated with conditions discovered during construction <br />or geotechnical exploration (i.e. underground storage tanks /hazardous <br />materials, unusually large quantities of rock or unsuitable material, on -site <br />disposal area /landfills, etc.) <br />c. Water re -use or water supply well system design <br />d. Site retaining wall design above 48 inches <br />e. Wetlands delineation /permitting <br />f. Irrigation design <br />
The URL can be used to link to this page
Your browser does not support the video tag.