Orange County NC Website
6. Fee <br />A. The following fees are intended to replace all design fees (with the exception of the <br />Preliminary Study fee) provided on our original proposal dated March 1, 2016. <br />EAC Building (Conventional) <br />Schematic Design <br />$46,970 <br />Design Development <br />$65,990 <br />Construction Documents <br />$95,230 <br />Bidding <br />$10,180 <br />Construction Administration <br />$87,500 <br />Closeout <br />$11,580 <br />Subtotal <br />$317,450 <br />Park Ops Building (Pre - Engineered) <br />Schematic Design <br />$18,800 <br />Design Development <br />$24,900 <br />Construction Documents <br />$36,100 <br />Bidding <br />$6,300 <br />Construction Administration <br />$32,100 <br />Closeout <br />$7,100 <br />Subtotal <br />$125,300 <br />Site /Civil Engineering <br />Schematic Design <br />$9,200 <br />Design Development <br />$18,400 <br />Construction Documents <br />$25,300 <br />Bidding <br />$4,600 <br />Construction Administration <br />$13,800 <br />Closeout <br />$4,600 <br />Subtotal <br />$75,900 <br />Total Basic Design Fee $518,650 <br />Additional Services (if requested) <br />Security System Design $4,600 <br />Site Lighting Design $4,600 <br />* Note: The fees detailed above are not intended to be "a la carte" and are broken up purely for <br />informational purposes. <br />7 <br />