17 <br />4. Bidding: Assumes Construction Manager at Risk delivery method. Assist with <br />prequalification and bidding of the Construction Manager's subcontractors. <br />B. Basic Desiqn Phase 2 (estimated Summer 2019 start, pending progress on the <br />separate total site package) <br />Construction Administration (CA): Basic fee includes construction <br />administration for an estimated duration of ten (10) months. Assumes Construction <br />Manager at Risk delivery method. Perform architectural coordination, submittal <br />review, and related Construction Administration. Lead the pre- construction <br />meeting. Provide bi- weekly jobsite visits (up to 22 visits anticipated) and lead <br />monthly construction meetings (up to 10 meetings anticipated), punch list and final <br />inspection. <br />2. Closeout (CO): Record drawings and closeout of project. <br />5. Schedule <br />A. We understand the goal is for construction to begin in the Summer of 2019. The <br />following is an estimated schedule for the scope upon receipt of Notice to Proceed: <br />1. Schematic Design ( SD) ................................ ............................... 8 weeks <br />2. SD Owner review ......................................... ............................... <br />3 weeks <br />3. Design Development (DD) ........................... ............................... <br />8 weeks <br />4. DD Owner review ......................................... ............................... <br />3 weeks <br />5. Construction Documents (CD) ..................... .............................12 <br />weeks <br />6. CD Owner /AHJ review* ................................ ..............................6 <br />weeks* <br />7. Bidding ......................................................... ............................... <br />5 weeks <br />8. Contract Negotiation .................................... ............................... <br />4 weeks <br />9. Construction Duration ................................ ............................... <br />44 weeks <br />B. *Permitting review times may vary <br />