Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />4. Bidding: Assumes Construction Manager at Risk delivery method. Assist with <br />prequalification and bidding of the Construction Manager's subcontractors. <br />B. Basic Desiqn Phase 2 (estimated Summer 2019 start, pending progress on the <br />separate total site package) <br />Construction Administration (CA): Basic fee includes construction <br />administration for an estimated duration of ten (10) months. Assumes Construction <br />Manager at Risk delivery method. Perform architectural coordination, submittal <br />review, and related Construction Administration. Lead the pre- construction <br />meeting. Provide bi- weekly jobsite visits (up to 22 visits anticipated) and lead <br />monthly construction meetings (up to 10 meetings anticipated), punch list and final <br />inspection. <br />2. Closeout (CO): Record drawings and closeout of project. <br />5. Schedule <br />A. We understand the goal is for construction to begin in the Summer of 2019. The <br />following is an estimated schedule for the scope upon receipt of Notice to Proceed: <br />1. Schematic Design ( SD) ................................ ............................... 8 weeks <br />2. SD Owner review ......................................... ............................... <br />3 weeks <br />3. Design Development (DD) ........................... ............................... <br />8 weeks <br />4. DD Owner review ......................................... ............................... <br />3 weeks <br />5. Construction Documents (CD) ..................... .............................12 <br />weeks <br />6. CD Owner /AHJ review* ................................ ..............................6 <br />weeks* <br />7. Bidding ......................................................... ............................... <br />5 weeks <br />8. Contract Negotiation .................................... ............................... <br />4 weeks <br />9. Construction Duration ................................ ............................... <br />44 weeks <br />B. *Permitting review times may vary <br />