Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Operations Facility: design will pursue a pre- engineered metal building <br />(PEMB). Structural design will be limited to foundation design for a slab -on- <br />grade foundation. Engineer will review the building manufacturer's design <br />criteria and final foundation reactions and will be considered the structural <br />engineer of record. <br />2. Additional Scope <br />A. In the event that any of the following items are requested and /or required, the <br />corresponding fees in section 4 will be needed: <br />1. Security system component design <br />2. Site lighting design <br />3. Consultants <br />A. For Structural Engineering, we propose: <br />Lynch Mykins Structural Engineers, PC <br />Contact: Anna E. Lynch, PE <br />415 Hillsborough Street <br />Raleigh, NC 27603 <br />Phone: (919) 782 -1833 <br />B. For Mechanical Electrical, and Plumbing (MEP) Engineering, we propose: <br />1. Stanford White, Inc. <br />Contact: William M. Smith, PE <br />P.O. Box 19944 <br />Raleigh, NC 27619 <br />Phone: (919) 832 -8118 <br />C. For Site /Civil Engineering, we propose: <br />Civil Consultants, Inc. <br />Contact: Tony Whitaker, PE <br />3708 Lyckan Parkway, Suite 201 <br />Durham, NC 27707 <br />Phone: (919) 490 -1645 <br />4. Basic Design Phases <br />A. Basic Design Phase 1 <br />Schematic Design (SD): Perform preliminary code analysis. Provide written <br />project narrative, site plan, building floor plans, and cost estimate. Attend all <br />meetings required by Owner. Submit to Owner and AHJ and coordinate for <br />approval. <br />2. Design Development (DD): Respond to all SD comments. Continue design <br />process in all disciplines. Provide outline specifications, code summary sheet, site <br />plans, floor plans, and wall sections. Provide room /door schedules, engineering <br />drawings, and cost estimate. Attend all meetings required by Owner. Submit to <br />Owner and AHJ and coordinate for approval. <br />irk <br />3. Construction Documents (CD): Respond to all DD comments. Provide full <br />working drawings and specifications. Submit to Owner and AHJ and coordinate for <br />approval. Provide cost estimate. Attend /lead all meetings required by Owner. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.