Browse
Search
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 09-04-2018 Regular Meeting
>
Agenda - 09-04-2018 7-a - Northern Campus Capital Project Progress Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 4:02:06 PM
Creation date
8/30/2018 3:46:10 PM
Metadata
Fields
Template:
BOCC
Date
9/4/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 09-04-2018 Regular Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 09-04-2018 Regular Meeting
Minutes 09-04-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />G. For the purposes of this proposal, we have assumed that both projects will be designed <br />as part of a single design package and will be bid and constructed concurrently. The <br />construction delivery method shall be Construction Manager at Risk by a qualified <br />Construction Manager under a separate contract. The project will be permitted through <br />the Town of Hillsborough. <br />H. Basic Design Scope: The scope of work for each discipline is as follows: <br />1. Architectural design includes: <br />a. Overall leader of the project <br />b. Confirm programmatic requirements <br />c. Conduct meetings with Owner and stakeholders <br />d. Design of the 17,000 SF Environment and Agricultural Center and 6,000 SF <br />Park Operations Facility <br />e. Provide code summary and compliance <br />f. Coordinate all disciplines of design <br />g. Present work at each of the phases listed in section 4 <br />h. Secure approvals from all authorities having jurisdiction <br />i. Assist with questions <br />j. Assist the Construction Manager with cost estimates at each phase <br />k. Assist with bidding <br />I. Oversee construction administration services <br />m. Oversee closeout documentation <br />2. Site /Civil design includes: <br />a. Engineer's work will include necessary coordination to secure approvals by <br />the Owner, Town of Hillsborough, and North Carolina Department of <br />Environmental Quality. <br />b. The overall campus project will require design of at least one stormwater <br />detention and treatment device, which will be covered under separate <br />agreement with others. No additional stormwater management strategies are <br />anticipated for the Environmental and Agricultural Center and Park <br />Operations Facility. <br />c. Water and sewer main extensions for the overall campus will be covered <br />under separate agreement with others. The DEAPR facilities will connect to <br />these using individual service lines. <br />d. The project will require an onsite water main service to supply a fire protection <br />sprinkler system for the Environment and Agricultural Center. Engineer will <br />provide a fire protection flow analysis for the project to verify water system <br />flow and pressure. Engineer will rely on fire hydrant flow test data provided by <br />the Town of Hillsborough for this purpose. <br />e. Landscape planting design for code minimum compliance. Design and <br />selection of landscape plantings within the outdoor demonstration gardens is <br />not included. It is assumed any landscape irrigation system will be vendor <br />designed, and irrigation design is not covered under this agreement. <br />f. A traffic impact study is not anticipated and not included under this <br />agreement. Work related to roadway widening for a left -turn lane along <br />Highway 70, as well as sidewalk improvements along the Highway 70 <br />frontage, is covered under a separate agreement with others. <br />g. Solid waste facilities to serve the Orange County Northern Campus will be <br />provided under a separate agreement, including the Solid Waste <br />Management Plan. It is assumed the DEAPR facilities will have access to the <br />campus solid waste facilities. <br />3. Plumbing design includes: <br />Domestic Water System Design within and beneath the extents of the building <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.