Orange County NC Website
14 <br />G. For the purposes of this proposal, we have assumed that both projects will be designed <br />as part of a single design package and will be bid and constructed concurrently. The <br />construction delivery method shall be Construction Manager at Risk by a qualified <br />Construction Manager under a separate contract. The project will be permitted through <br />the Town of Hillsborough. <br />H. Basic Design Scope: The scope of work for each discipline is as follows: <br />1. Architectural design includes: <br />a. Overall leader of the project <br />b. Confirm programmatic requirements <br />c. Conduct meetings with Owner and stakeholders <br />d. Design of the 17,000 SF Environment and Agricultural Center and 6,000 SF <br />Park Operations Facility <br />e. Provide code summary and compliance <br />f. Coordinate all disciplines of design <br />g. Present work at each of the phases listed in section 4 <br />h. Secure approvals from all authorities having jurisdiction <br />i. Assist with questions <br />j. Assist the Construction Manager with cost estimates at each phase <br />k. Assist with bidding <br />I. Oversee construction administration services <br />m. Oversee closeout documentation <br />2. Site /Civil design includes: <br />a. Engineer's work will include necessary coordination to secure approvals by <br />the Owner, Town of Hillsborough, and North Carolina Department of <br />Environmental Quality. <br />b. The overall campus project will require design of at least one stormwater <br />detention and treatment device, which will be covered under separate <br />agreement with others. No additional stormwater management strategies are <br />anticipated for the Environmental and Agricultural Center and Park <br />Operations Facility. <br />c. Water and sewer main extensions for the overall campus will be covered <br />under separate agreement with others. The DEAPR facilities will connect to <br />these using individual service lines. <br />d. The project will require an onsite water main service to supply a fire protection <br />sprinkler system for the Environment and Agricultural Center. Engineer will <br />provide a fire protection flow analysis for the project to verify water system <br />flow and pressure. Engineer will rely on fire hydrant flow test data provided by <br />the Town of Hillsborough for this purpose. <br />e. Landscape planting design for code minimum compliance. Design and <br />selection of landscape plantings within the outdoor demonstration gardens is <br />not included. It is assumed any landscape irrigation system will be vendor <br />designed, and irrigation design is not covered under this agreement. <br />f. A traffic impact study is not anticipated and not included under this <br />agreement. Work related to roadway widening for a left -turn lane along <br />Highway 70, as well as sidewalk improvements along the Highway 70 <br />frontage, is covered under a separate agreement with others. <br />g. Solid waste facilities to serve the Orange County Northern Campus will be <br />provided under a separate agreement, including the Solid Waste <br />Management Plan. It is assumed the DEAPR facilities will have access to the <br />campus solid waste facilities. <br />3. Plumbing design includes: <br />Domestic Water System Design within and beneath the extents of the building <br />3 <br />