Orange County NC Website
EC6 Drought Emergency Measures, Continued <br />I <br />Permanent and <br />Temporary <br />Measures <br />5ZI <br />3 <br />Exhibit 8 <br />(Par. 82, 85, 86) <br />The following table shows permanent measures and temporary <br />measures. <br />Permanent Measures <br />Temporary Measures <br />buried pipelines <br />temporary pipelines <br />irrigation tailwater recovery <br />systems for orchards and <br />vineyards <br />spring developments <br />construction and deepening of <br />wells <br />earthen tanks where a source <br />of underground water is <br />available <br />dugouts <br />water troughs <br />F development of seeps <br />11 -26 -93 1 -ECP (Rev. 2) Amend. 1 Page 23 <br />