Browse
Search
091599 Item 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-15-1999 Schools
>
091599 Item 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 12:14:29 PM
Creation date
8/29/2018 12:10:15 PM
Metadata
Fields
Template:
BOCC
Date
9/15/1999
Meeting Type
Schools
Document Type
Agenda
Agenda Item
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Cost of New Facilities <br />Elementary School Capacity = 600 students <br />Middle School Capacity = 700 students <br />Square Ft. per Student <br />Construction Cost <br />Cost Per Square Foot <br />Site Acquisition <br />Acres: <br />$ 90 <br />Average Cost Per Acre: <br />Site Development <br />As a percentage of Construction Cost <br />Fees <br />As a percentage of Construction Costs and Site Development <br />Moveable Equipment <br />As a percentage of Construction Cost <br />Technology <br />Cost per square foot <br />(includes cabling and equipment for voice, video and data distribution systems) <br />Construction Contingency As a percentage of Construction Cost and Site Development <br />Start-Up Costs <br />Non Personnel One time start-up costs <br />Middle School Capacity = 700 students <br />pil <br />Square Footage <br />Square Ft. per Student <br />Construction Cost <br />Cost Per Square Foot <br />Site Acquisition <br />Acres: <br />$ 90 <br />Average Cost Per Acre <br />Site Development <br />As a percentage of Construction Cost <br />Fees <br />As a percentage of Construction Costs and Site Development <br />Moveable Equipment <br />As a percentage of Construction Cost <br />Technology <br />Cost per square foot <br />(includes cabling and equipment for voice, video and data distribution systems) <br />Construction Contingency As a percentage of Construction Cost and Site Development <br />Start-Up Costs <br />Non Personnel Start Up - one time <br />pil <br />Square Footage <br />959225 <br />158.7 <br />$ 90 <br />$ <br />8,570,250 <br />16 <br />25,000 <br />$ <br />400,000 <br />10% <br />$ <br />857,025 <br />10% <br />942,728 <br />5% <br />$ <br />428,513 <br />$ 8.25 <br />$ <br />785,606 <br />5% <br />$ <br />471,364 <br />$ <br />330,000 <br />Total <br />$ <br />12,7859485 <br />Square Footage <br />1329192 <br />188.8 <br />$ 95 <br />$ <br />12,558,240 <br />22 <br />25,000 <br />$ <br />550,000 <br />10% <br />$ <br />1,255,824 <br />10% <br />1,381,406 <br />5% <br />$ <br />627,912 <br />$ 8.25 <br />$ <br />1,090,584 <br />5% $ 690,703 <br />$ 350,000 <br />Total $ 18,504,670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.