Browse
Search
ORC agenda 080118
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2018
>
ORC agenda 080118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:56:21 AM
Creation date
8/29/2018 11:47:17 AM
Metadata
Fields
Template:
BOCC
Date
8/1/2018
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5.7: Standards for Recreational Uses <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-88 <br /> <br />(a) If contaminants are found that reasonably may be attributed to the <br />construction, operation, and/or maintenance of the golf course, <br />management plans shall be reviewed to assess the problem. Appropriate <br />adjustments in the resource management and/or integrated pest <br />management plans shall be made to prevent further contamination; and <br />(b) If sampling and analysis indicate a trend toward increased <br />concentrations of contaminants or if the U.S. Environmental Protection <br />Agency health advisory limits (HAL) or State ground or surface water <br />standards for thresholds are exceeded, then Orange County will notify <br />the appropriate authorities. <br />5.7.5 Camp / Retreat Center <br />(A) Submittal Requirements and Standards of Evaluation for Class B Special Use <br />Permit <br />(1) Submittal Requirements <br />In addition to the information required by Section 2.7, the following shall be <br />submitted as part of the application: <br />(a) A site plan prepared in accordance with Section 2.5, also showing the <br />following (existing or proposed): <br />(i) Buildings, <br />(ii) Campsites, <br />(iii) Storage areas, <br />(iv) Fencing and gates, <br />(v) Outdoor recreation areas <br />(vi) Access road(s) to the site, as well as on site roads, with an <br />indication of type of proposed surface. <br />(b) A description of the type of facility planned, the size, capacity, and use of <br />proposed buildings; a signed statement from the owners or operators <br />that there shall be no activity allowed that will have adverse effects on <br />adjacent property. The statement shall also include a complete list of all <br />recreational activities that will take place on the site. <br />(c) A phasing plan, when necessary, indicating the area to be developed in <br />each phase with time periods for construction of each phase. This may <br />be indicated on the site plan. <br />(2) Standards of Evaluation <br />(a) Unless public sewer is proposed to be extended, the adequacy for the <br />method of sewage disposal will be determined by the lot size and soil <br />suitability. Appropriate letters from the Orange County Environmental <br />Health Department, local jurisdictions and/or the State Division of <br />Environmental Management shall be submitted to indicate preliminary <br />approval. <br />(b) The site plan shall show the distances to the nearest residential <br />structures. <br />(c) The landscape plan shall show how the facilities will be screened from <br />the adjacent properties. A minimum 30 foot Type B buffer, as indicated <br />in Section 6.8 shall be observed around the perimeter of the property. <br /> 102
The URL can be used to link to this page
Your browser does not support the video tag.