Orange County NC Website
Article 9: Enforcement <br /> Section 9.8: Soil Erosion and Sedimentation Control <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 9-8 <br /> <br />owner shall be entitled to be heard in person or by counsel and to present arguments and <br />evidence pertaining to the matter. <br />(C) Following the hearing, the Floodplain Administrator may issue such order to alter, vacate, <br />or demolish the structure; or to remove fill as appears appropriate. <br />9.7.2 Order to Take Corrective Action <br />(A) If, upon a hearing held pursuant to the notice prescribed above, the Floodplain <br />Administrator shall find that the structure or development is in violation of this Ordinance, <br />he or she shall make an order in writing to the owner, requiring the owner to remedy the <br />violation within a specified time period, not less than 60 days. <br />(B) Where the Floodplain Administrator finds that there is imminent danger to life or other <br />property, he or she may order that corrective action be taken in such lesser period as <br />may be feasible. <br />(C) In the absence of an appeal (see Section 2.27.7), the order of the Floodplain <br />Administrator shall be final. <br />9.7.3 Failure to Comply with Order <br />If the owner of a building or property fails to comply with an order to take corrective action from <br />which no appeal has been filed, or fails to comply with an order of the governing body following <br />an appeal, he or she shall be guilty of a Class 3 misdemeanor and shall be punished in the <br />discretion of the court. If the owner of a building or property fails to comply with an order to take <br />corrective action for which no appeal has been made or fails to comply with an order of the <br />governing body following an appeal, the owner shall be guilty of a Class 1 misdemeanor pursuant <br />to NC G.S. § 143-215.58 and shall be punished at the discretion of the court <br />SECTION 9.8: SOIL EROSION AND SEDIMENTATION CONTROL <br />9.8.1 Inspections and Investigations <br />(A) Site Inspections <br />Agents, officials, or other qualified persons authorized by the County will periodically <br />inspect land-disturbing activities to ensure: <br />(1) Compliance with the North Carolina Sedimentation Pollution Control Act of 1973 <br />(“Act” in this Section), this Ordinance, or rules or orders adopted or issued <br />pursuant to this Ordinance; <br />(2) The measures required in the plan are effective in controlling erosion and <br />sediment resulting from land-disturbing activity. <br />Notice of the right to inspect shall be included in the letter of approval of each Erosion <br />Control Plan. <br />(B) Authority to Enter Property and Conduct Investigations and Inspections <br />(1) No person shall willfully resist, delay, or obstruct an authorized representative, <br />employee, or agent of Orange County, while that person is inspecting or <br />attempting to inspect a land-disturbing activity under this section. <br />(2) The Erosion Control Officer shall have the power to conduct such investigations <br />as deemed reasonably necessary to carry out the duties as prescribed in this <br />Ordinance, and for this purpose to enter at reasonable times upon any property, <br />public or private, for the purpose of investigating and inspecting the sites of any <br />land-disturbing activities. <br />(3) No person shall refuse entry or access to any authorized representative or agent <br />of the County who requests entry for purposes of inspection, and who presents <br />appropriate credentials, nor shall any person obstruct, hamper or interfere with <br />any such representative while in the process of carrying out their official duties. <br /> 79