Browse
Search
ORC agenda 090617
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2017
>
ORC agenda 090617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:54:44 AM
Creation date
8/29/2018 11:43:27 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2017
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures <br /> Section 2.6: Floodplain Development APPLICATION, Permit and Certificate Requirements <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 2-16 <br /> <br />(a) Said certification shall be prepared by, or under the direct supervision of, <br />a North Carolina licensed professional Land Surveyor or Professional <br />Engineer and certified by them. <br />(b) Any work done within the 21 7 day calendar period and before <br />submission of the certification shall be at the permit holder’s risk. <br />(2)(3) The floodplain administrator shall review the certificate data submitted. <br />Deficiencies detected by such review shall be corrected by the permit holder <br />immediately and before further work being permitted to proceed. <br />(3)(4) Failure to submit the certification or failure to make required corrections shall be <br />cause to deny the floodplain development permit and/or issue a stop-work order <br />for the project. <br />(B)(5) A Final As-Built Elevation Certificate (FEMA Form 81-31)final Finished <br />Construction Elevation Certificate (FEMA Form 086-0-33) is required after <br />construction is completed and prior to Certificate of Compliance/Occupancy <br />issuance. <br />(1)(a) It shall be the duty of the permit holder to submit to the Floodplain <br />Administrator a certification of final as-built construction of the elevation <br />of the reference level and all attendant utilities. <br />(a)(i) Elevation certification shall be prepared by, or under the direct <br />supervision of, a North Carolina licensed professional Land <br />Surveyor or Professional Engineer and certified by the same. <br />(2)(b) The Floodplain Administrator shall review the certificate data submitted. <br />Deficiencies detected by such review shall be corrected by the permit <br />holder immediately and prior to Certificate of Compliance/Occupancy <br />issuance. <br />(3)(c) In some instances, another certification may be required to certify <br />corrected as-built construction. <br />(4)(d) Failure to submit the certification or failure to make said corrections <br />required shall be cause to withhold the issuance of a Certificate of <br />Compliance/Occupancy. <br />(e) The Finished Construction Elevation Certificate certifier shall provide at <br />least 2 photographs showing the front and rear of the building taken <br />within 90 days from the date of certification. The photographs must be <br />taken with views confirming the building description and diagram number <br />provided within the Finished Construction Elevation Certificate. These <br />photographs should show the entire building, including foundation. If the <br />building has split-level or multi-level areas, provide at least 2 additional <br />photographs showing side views of the building. In addition, when <br />applicable, provide a photograph of the foundation showing a <br />representative example of the flood openings or vents. All photographs <br />must be in color and measure at least 3" × 3". Digital photographs are <br />acceptable.22 <br />(B) Floodproofing Certificate (FEMA Form 086-0-34)23 <br />(1) In those instances where non-residential floodproofing is used to meet the <br />Regulatory Flood Protection Elevation requirements, a Floodproofing Certificate <br />(FEMA Form 086-0-34) is required prior to the actual start of construction. <br /> <br />22 This is new language the County is obligated to include in the UDO I order to continue to be eligible for <br />participation in the Community Rating System (CRS) program, which allows for a reduction in flood insurance <br />premiums to local property owners due to our administration/enforcement of a floodplain management program. <br />23 Revised language consistent with the new FEMA model flood ordinance. <br />Formatte <br />Formatte <br />Formatte <br />Formatte <br />Formatte <br />Formatte <br />Formatte <br />Formatte <br /> 40
The URL can be used to link to this page
Your browser does not support the video tag.