Orange County NC Website
Article 1: Administration <br /> Section 1.3: Board of County Commissioners <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 1-9 <br /> <br />Board of Adjustment. The Planning Director and the Board of Adjustment, in interpreting the <br />Zoning Atlas or deciding any appeal, shall apply the following standards: <br />(A) Boundaries indicated as approximately following the centerlines of streets; highways or <br />alleys shall be construed as following such centerlines; <br />(B) Boundaries indicated as approximately following lot lines shall be construed as following <br />such lot lines; <br />(C) Boundaries indicated as approximately following City Limits shall be construed as <br />following such City Limits; <br />(D) Boundaries indicated as following railroad lines shall be construed to be the center line of <br />the main track; <br />(E) Boundaries indicated as following shorelines shall be construed to follow such shorelines; <br />in the event of change in the shoreline, the boundary shall be construed as moving with <br />the actual shorelines; <br />(F) Boundaries indicated as approximately following the centerlines of streams, rivers, <br />canals, lakes or other bodies of water shall be construed as following such centerlines; <br />(G) Boundaries shown as approximately following designated flood hazard area limits shall <br />be construed as following such limits; <br />(H) Boundaries indicated as parallel to or extensions of features indicated in Subsections A <br />through E above shall be so construed. Distances not specifically indicated on the <br />Zoning Atlas shall be determined by reference to the scale of the Atlas; and <br />(I) Where physical or cultural features existing on the ground are at variance with those <br />shown on the Zoning Atlas, or in other circumstances not covered by Subsections A <br />through F above, the Board of Adjustment shall interpret the district boundaries. <br />In addition, the following guidelines shall be required in determining the boundaries of the Special <br />Flood Hazard Area Overlay District: <br />(J) The boundaries of the Special Flood Hazard Area Overlay District shall be determined <br />utilizing the Flood Insurance Study; <br />(K) In areas between official cross sections, the Special Flood Hazard Overlay District shall <br />be determined by scaling the distances on Flood Insurance Study maps; and <br />(L) The regulatory flood protection elevation must in all cases be the controlling factor in <br />locating the outer limits of the Special Flood Hazard Area Overlay District.9 <br />SECTION 1.3: BOARD OF COUNTY COMMISSIONERS <br />1.3.1 Responsibilities <br />The Orange County Board of Commissioners shall have the following responsibilities in relation to <br />the administration of this Ordinance: <br />(A) Hear and decide applications for amendments to the text, schedules, and map portions of <br />this Ordinance, which shall be processed in accordance with the provisions detailed <br />herein. In exercising this power, the Board is bound by the State enabling legislation, the <br />terms of this Ordinance, and applicable court decisions in carrying out its legislative <br />function. <br />(B) Hear and decide applications for the approval of Class A Special Use permit as noted in <br />the Schedule of Permitted Uses as requiring approval of the Board of Commissioners, <br />which shall be processed in accordance with the provisions detailed herein. In exercising <br />this power, the Board is bound by the State enabling legislation, the terms of this <br />Ordinance, and applicable court decisions in carrying out its decision making function <br />within a quasi-judicial capacity and shall make its decisions based on substantial <br /> <br />9 As we are eliminating the Special Flood Hazard Area Overlay District, these provisions are no longer necessary.  <br /> 32