Browse
Search
ORC agenda 070517
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2017
>
ORC agenda 070517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:54:56 AM
Creation date
8/29/2018 11:40:06 AM
Metadata
Fields
Template:
BOCC
Date
7/5/2017
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions <br /> Section 7.13: Specifications for Plat Drawings <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 7-60 <br /> <br />(2) A scaled drawing in black ink or pencil detailing the proposed division of property <br />including, but not limited to, the following: <br />(a) The scale of the drawing, <br />(b) A north arrow, <br />(c) The date of preparation, <br />(d) The Parcel Identification Number (PIN) number(s) of the lot(s) subject to <br />the application, <br />(e) The proposed property lines for each lot, <br />(f) Common Open Space lots, including type and acreage, <br />(g) A Site Analysis Map as outlined in Site features as Outlined in Section <br />UDO 7.13.2 (A)(3) below, <br />(h) The delineation of any known and required stream buffers on the <br />proposed lot(s), <br />(i) The proposed method for ingress and egress including a description of <br />how each lot will be afforded access, <br />(j) A narrative detailing the development of all proposed roadways, <br />(k) A private road justification, if required under Section 7.8, and <br />(l) Any other reasonable relevant information. <br />(B) Final Plat <br />Final plats shall adhere to the specifications contained in Section 7.14.3. <br />7.13.2 Major Subdivisions <br />(A) Concept Plan <br />(1) In General <br />(a) The required Concept Plan for Major Subdivisions consists of three <br />parts: <br />(i) A Site Analysis Map; <br />(ii) A Conventional Subdivision Option; and <br />(iii) A Flexible Development Option. <br />(b) The Concept Plan shall be prepared according to the “four-step” process <br />for designing Flexible Development subdivisions, as described herein. <br />(c) The Concept Plan shall be drawn in black ink or pencil to a scale of not <br />less than 200 feet to the inch. The scale chosen shall be large enough to <br />show all required detail clearly and legibly. <br />(2) Required General Information <br />Each Site Analysis Map and Development Option shall contain the following <br />general information: <br />(a) A sketch vicinity map showing the location of the subdivision in relation <br />to the existing street or highway system; <br />(b) The plotted boundaries of the tract from deeds or maps of record and the <br />portion of the tract to be subdivided; <br />(c) The total acreage to be subdivided, including tax map, block and lot <br />number reference; <br /> 47
The URL can be used to link to this page
Your browser does not support the video tag.