Browse
Search
ORC agenda 070517
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2017
>
ORC agenda 070517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:54:56 AM
Creation date
8/29/2018 11:40:06 AM
Metadata
Fields
Template:
BOCC
Date
7/5/2017
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions <br /> Section 7.3: Phasing of Subdivisions <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 7-3 <br /> <br />A tract of land in a Rural Designated area on the Growth Management System <br />map that is proposed for a subdivision of 41 or more lots. <br />(5) Major Subdivision, Conditional Use, Urban Designated <br />A tract of land in an Urban Designated area on the Growth Management System <br />map that is proposed for a subdivision of 80 or more lots. <br />(B) For the purpose of determining whether a subdivision is a Major Subdivision, Class A <br />Special Use (Rural Designated or Urban Designated), or a Major Subdivision, Conditional <br />Use District (Rural Designated or Urban Designated), the number of lots created shall be <br />determined by counting the cumulative number of lots created, through subdivisions, on a <br />tract or parcel of land as the boundaries of said tract or parcel of land existed in the Land <br />Records of Orange County as of November 5, 2003. <br />SECTION 7.3: PHASING OF SUBDIVISIONS <br />(A) A major subdivision may be developed in phases, provided that: <br />(A)(1) Each phase contains at least five lots, unless depicted on a phasing plan <br />approved by the Board of County Commissioners as part of the preliminary <br />subdivision plat with the express determination that the proposed phasing makes <br />it unlikely that a subdivider would willingly abandon a final phase that contai ns a <br />required extension of a road or other infrastructure; <br />(B)(2) The degree and extent of road, water supply, sewage disposal, stormwater <br />management, erosion and sedimentation control, and other required <br />improvements in the phase and previously approved phases i s sufficient to serve <br />or handle all development within the phase; <br />(C)(3) The number of lots and amount of required open space in the phase and any <br />previously approved phases is proportional; and <br />(D)(4) A phasing plan showing the phases of development and the requirement s of this <br />Ordinance that will be satisfied in each phase is approved by the Board of <br />County Commissioners as part of the preliminary final plat. <br />(E)(B) A minor subdivision utilizing the Flexible Development Option may be developed in <br />phases, provided that: <br />(A)(1) The degree and extent of road, water supply, sewage disposal, stormwater <br />management, erosion and sedimentation control, and other required <br />improvements in the phase and previously approved phases is sufficient to serve <br />or handle all development within the phase; <br />(B)(2) The number of lots and amount of required open space in the phase and any <br />previously approved phases is proportional; and <br />(C)(3) A phasing plan showing the phases of development and the requirements of this <br />Ordinance that will be satisfied in each phase is appro ved by the Planning <br />Director as part of the preliminary final plat. <br />SECTION 7.4: IMPROVEMENTS AND PERFORMANCE GUARANTEES <br />7.4.1 Generally <br />(A) Improvements proposed by the subdivider or required by this Ordinance, shall be <br />constructed in accordance with the standards and requirements provided in this <br />Ordinance. <br />(B) In those instances where said improvements are required to be constructed subsequent <br />to the approval of the Final Plat, plans and specifications for said improvements shall be <br />approved by the appropriate agency and reference to said improvements shall be made <br />part of the Final Plat. <br /> 29
The URL can be used to link to this page
Your browser does not support the video tag.