Orange County NC Website
Article 5: Uses <br /> Section 5.14: Standards For Manufacturing, Assembly & Processing <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-146 <br /> <br />before a comprehensive groundwater study is required. The water usage <br />rates of any existing use subject to zoning regulations located on the <br />same lot shall be taken into account when determining if a <br />comprehensive groundwater study is required. Said study shall detail: <br />(i) The amount of water anticipated to be used on a daily, weekly, <br />monthly, and annual basis by regulated uses located on the <br />parcel (e.g., water usage by bona fide farm uses is not required <br />to be included); <br />(ii) An analysis of the amount of groundwater withdrawal considered <br />to be safe and sustainable in the immediate vicinity; and <br />(iii) An analysis of whether other wells in the vicinity of the proposed <br />use are expected to be affected by withdrawals made by the <br />proposed use. <br />(2) Site shall have direct access to a major road, as classified in the Orange County <br />Comprehensive Plan, and shall use said road as the primary access, unless <br />approved otherwise in the permit. <br />(3) If located adjacent to residentially zoned property, all structures, facilities, storage <br />areas, and parking areas shall be setback a minimum of 100 feet from all <br />property lines. <br />(4) Major events may attract more than 150 people at one time and may occur more <br />frequently than twelve times per year. <br />(5) Loudspeakers and public address systems shall not be used before 7 a.m. or <br />after 7 p.m. if an existing residence is located within 1,000 feet of the facility, <br />unless approved otherwise in the permit. <br />(6) Special events shall cease no later than 9 p.m. on Sunday through Thursday or <br />11 p.m. on Friday and Saturday, unless approved otherwise in the permit. <br />(7) Food services are not allowed unless approved in the permit. <br />(8) The permit may limit the frequency of events. <br />(9) Retail sales are intended to be comprised primarily of products produced on-site <br />but may include complementary items. <br />5.14.9 Industrial, Light50 <br />(A) Standards for the O/RM Zoning District <br />(1) The following Multiple Uses are permitted in the O/RM zoning district when the <br />Principal Use type is Industrial, Light and adhere to the standards of Section <br />5.14.5(A)(2): <br />(a) Banks & Financial Institutions <br />(b) Beauty & Barber Shops <br />(c) Laundry & Dry Cleaning Services <br />(d) Nightclubs, Bars, Pubs <br />(e) Restaurants: Carry Out <br />(f) Restaurants: General <br />(g) Retail, Class 1 <br />(h) Printing & Lithography <br /> <br />50 Provisions have been reworked and relocated to Section 3.4 General Commercial Districts – O/RM district  <br />standards.    <br /> 158