Orange County NC Website
Article 2: Procedures <br /> Section 2.14: Minor Subdivisions <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 2-47 <br /> <br />(b) The period between the approval date of the Preliminary Plat and the <br />approval date of the Final Plat for the first phase does not exceed one <br />year; and <br />(c) The period between the approval date of the Final Plat of the first phase <br />and the approval date(s) of the Final Plat(s) of any subsequent phase(s) <br />does not exceed the time limits specified in the phasing plan of the <br />Preliminary Plat. If no phasing plan is indicated, then the period between <br />Final Plat approvals shall not exceed six months. <br />(8) If a phasing plan for construction of the subdivision is approved, the expiration <br />date of the Preliminary Plat shall be governed by the time period(s) approved as <br />part of the phasing plan. <br />(9) The Planning Director may extend the deadline for recordation provided the <br />applicant can demonstrate a good faith effort to comply with the deadline, but for <br />reasons beyond his/her control, fails to meet the requirements for recordation <br />within the specified period. <br />(10) All final plats shall conform to drawing specifications and certification <br />requirements for Final Plats contained in Section 7.14.3 7.13.3 of this Ordinance. <br />(11) Recordation of the approved final plat, and any required auxiliary documentation <br />shall be with the advice and consent of the Planning Director. <br /> 11