Orange County NC Website
Article 6: Development Standards <br /> Section 6.7: Additional Standards for MPD-CZD AND RMPD-CZ <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 6-42 <br /> <br />(B) Permitted Adjustments may be approved by the Planning Director. The Master Plan shall <br />be revised to show all permitted adjustments and filed with the Planning Department for <br />incorporation in the approved MPD-CZD or RMPD-CZ. Other changes to the Master <br />Plan shall be approved by the Board of County Commissioners in accordance with the <br />procedures specified in Section 2.9.2 of this Ordinance. <br />6.7.3 Final Development Plans <br />(A) Site plans shall be submitted subsequent to MPD-CZ or RMPD-CZ Master Plan approval <br />in accordance with the procedures established in Section 2.5 of this Ordinance. <br />(B) Approval of detailed site plans and related material is an administrative action and no <br />public notice or hearing is required. <br />(C) After a MPD-CZ or RMPD-CZ district has been established, no zoning compliance <br />permit, permit for land disturbing activity, building permit, or the like, shall be issued for <br />the site, unless and until the Planning Director has approved a site plan, prepared and <br />approved in accordance with Section 2.5 of this Ordinance, for the development as a <br />whole or each development lot/pod, in accordance with the approved Master Plan. <br />(D) Approval of site plans shall be based on compliance with regulations applying at the time <br />the land was zoned to MPD-CZ or RMPD-CZ. <br />(E) The Planning Director shall certify that all conditions imposed by the Board of County <br />Commissioners with the approval of the MPD-CZ or RMPD-CZ and Master Plan have <br />been met and a report shall be provided to the County Manager within 30 days following <br />the approval of a site plan for any property included within the MPD-CZ or RMPD-CZ. <br />6.7.4 Start of Construction & Extensions <br />(A) Site plans shall be approved and construction started in accordance with the timetable <br />approved with the Master Plan. If the site plan(s) have not been approved or no <br />construction has started within the stated time frames, the Master Plan becomes void and <br />of no effect. The owner can request an extension from the Board of County <br />Commissioners upon the favorable recommendation of the Planning Board, if the request <br />is received before the Master Plan expires. <br />(B) No changes shall be made to the conditions of approval with extension requests. <br />Approval of a time extension shall be based on evidence presented by the applicant <br />showing that approvals have been pursued in a timely manner, and that delays have <br />resulted from factors beyond the control of the developer. <br />6.7.5 Specific Standards for Hillsborough EDD <br />In addition to the standards and regulations for all MPD-CZ districts established in this Ordinance, <br />the standards contained herein shall apply to MPD-CZ districts in the Hillsborough Economic <br />Development District. <br />(A) Purpose and Intent <br />The purpose of the MPD-CZ in the Hillsborough Economic Development District is to <br />provide locations for a mix of residential, commercial and light industrial uses in a <br />cohesive development that is compatible with the natural terrain and surrounding uses. <br />This district encourages innovation by offering flexibility in design and layout <br />requirements to achieve a greater choice of living and working environments. <br />(B) Applicability <br />(1) The minimum size of a MPD-CZ district shall be 5 acres. <br />(2) This district shall only be applied where water and sewer are available at the site <br />or are to be made available to the site as part of the development approval <br />process. <br /> 135