Browse
Search
Agenda - 11-27-2000-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 11-27-2000
>
Agenda - 11-27-2000-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:26:35 PM
Creation date
8/29/2008 10:17:04 AM
Metadata
Fields
Template:
BOCC
Date
11/27/2000
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 11-27-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-140 Non-residential Approval Procedure for Subdivision, Zoning and Economic Development Ordinance Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONER'S <br />AND <br />PLANNING BOARD <br />PUBLIC HEARING AGENDA ITEM ABSTRACT <br />Meeting Date: November 27, 2000 <br />Action Agenda <br />Item No. .~ <br />SUBJECT: .Non-Residential Approval._Procedure for Subdivision, Zoning_and Economic <br />Development Ordinance Amendments <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) YES <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Proposed Ordinance Robert P. Davis, Planner III Ext. 2580 <br />Craig Benedict, Director Ext. 2592 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane (336)227-2031 <br />PURPOSE: To receive public comment on the proposed Approval Procedure Amendments for the <br />Economic Development, Commercial and/or Industrial Districts Amendments in the Subdivision, <br />Zoning Ordinance and Economic Development Districts Design Manual. <br />BACKGROUND <br />Request <br />• Amend the Approval Procedures and related sections in the Subdivision, Zoning Ordinance and <br />Economic Development Design Manual. <br />• Provides for initial review by the Planning StafF of proposed subdivisions in the Economic <br />Development, Commercial, and/or Industrial Districts. <br />• Sets up all subdivisions (minor and major) in these districts to follow the preliminary plan approval <br />process in the Subdivision Ordinance. <br />• Requires all roads in these subdivisions to be public and constructed to NCDOT standards. <br />• Provides for a minimum lot size of 4 acres in the Economic Development Districts. <br />• Requires dedication of right-of-way and construction of master planned roadways in Economic <br />Development districts. <br />• Promotes service and/or frontage. road interconnectivity. <br />• Limits road cuts to major roadways. <br />• Provides for non-conforming lot development standards. <br />Location <br />Amendments will apply to the entirety of Orange County lying outside the municipalities and their <br />extraterritorial jurisdictions, if any. <br />Development Process Schedule and Action <br />• Public Hearing on November 27, 2000. <br />• Refer amendment to the Planning Board for a recommendation back to the Board of County <br />Commissioners no sooner than January ~ ~ ~nn~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.