Browse
Search
ORC agenda 110613
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2013
>
ORC agenda 110613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:52:06 AM
Creation date
8/29/2018 11:23:40 AM
Metadata
Fields
Template:
BOCC
Date
11/6/2013
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(k) The Operations Plan and the Rehabilitation Plan shall be coordinated so <br />that the amount of disturbed land is kept to the absolute minimum <br />consonant with good practices and so that rehabilitation proceeds in <br />concert with extraction. <br />(l) No land disturbance shall take place within 250 feet of the zoning lot line <br />or the property line where the zoning line and the property line are one <br />and the same. Within the 250 foot setback area, existing vegetation <br />shall be retained for the purpose of providing a visual screen and noise <br />buffer. No disturbance or removal of vegetation shall be permitted <br />except for access roads leading from the excavation area to public <br />roads. Where vegetation within the 250 foot setback does not exist, the <br />applicant shall be required to provide a dense, evergreen buffer <br />consistent with the purpose cited above. The buffer shall be in place <br />prior to the initiation of any excavation activities. <br />(m) The applicant shall submit operational reports, prepared on an annual <br />basis, detailing the amounts of materials extracted, extent of extractive <br />area, depth of extractive area, and results of groundwater test borings. <br />(n) Annual inspections of the operation shall be conducted by the Planning <br />Director following submittal of the annual operations reports to determine <br />compliance with the provisions of the Special Use Permit. <br />(o) In cases of abandonment or termination of operations for a period of 12 <br />consecutive months, application for a new Special Use Permit is <br />required. <br />(p) The Board of County Commissioners shall require for all extractive uses <br />a performance guarantee to insure that the provisions of the <br />Rehabilitation Plan are met. Such performance guarantee shall be in a <br />form approved by the County Attorney. The amount of such guarantee <br />shall cover the cost of rehabilitation on a per acre basis, if the cost does <br />not exceed the amount posted with the State. If the rehabilitation cost <br />exceeds the amounts required by the State then the difference shall be <br />made up in a bond to Orange County. <br />SECTION 5.13: STANDARDS FOR AGRICULTURAL USES <br />5.13.1 Commercial Feeder Operation 24 <br />(A) General Standards <br />Property to be utilized for poultry raising, cattle feeding, hog feeding, or other similar uses <br />that are not a part of a bona fide farm may be established in accordance with the Table of <br />Permitted Uses subject to the following conditions: <br />(1) All structures, buildings or enclosed areas, used for housing of poultry, hogs, <br />cattle or other livestock, shall be a minimum of 100 feet from all property lines. <br />(2) No structures, buildings or enclosed areas, housing poultry, hogs, cattle or other <br />livestock shall be less than 120 feet from any residence. <br />(3) Care shall be exercised that odor is kept to a minimum level through frequent <br />cleaning of the area. <br />24 This is a bona fide agricultural use and cannot be regulated by zoning so staff is suggesting it be removed from <br />the UDO. <br />77
The URL can be used to link to this page
Your browser does not support the video tag.