Browse
Search
ORC agenda 100213
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Ordinance Review Committee
>
Agendas
>
2013
>
ORC agenda 100213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 11:23:26 AM
Creation date
8/29/2018 11:20:57 AM
Metadata
Fields
Template:
BOCC
Date
10/2/2013
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br /> Section 5.10: Standards for Telecommunication Facilities <br /> <br /> <br /> <br />Orange County, North Carolina – Unified Development Ordinance Page 5-90 <br /> <br />(a) The applicant shall, at least six weeks prior to a Class B Special Use <br />Permit public hearing and at least 11 weeks prior to a Class A Special <br />Use Permit public hearing, conduct a balloon test whereby the applicant <br />shall arrange to fly, or raise upon a temporary mast, a minimum of 10’3” <br />in length, brightly colored red or orange balloon at the maximum height <br />of the proposed new wireless support structure. <br />(b) The balloon test shall be flown for at least four consecutive daylight <br />hours starting sometime between 10:00 A.M. and 2:00 P.M. on the dates <br />chosen. <br />(c) A notice of the dates (including a second date in case of poor visibility, <br />weather or atmospheric conditions on the initial date), times, and location <br />of the balloon test shall be mailed, by certified mail, return receipt <br />requested, by the applicant, to all persons owning property within 1,000 <br />feet of the subject parcel no less than 14 days in advance of the first test <br />date. The data contained within the office of Orange County Land <br />Records shall be used as the primary source for determining which <br />residents are to receive notice of the balloon tests. <br />(d) The primary date shall be on a weekend (excluding legal holidays), but to <br />prevent delays in the processing of the application, and in case of poor <br />weather or atmospheric conditions on the initial date, the secondary <br />date may be a weekday. <br />(e) The applicant shall inform the County Planning Staff, in writing, of the <br />dates and times of the test at least 14 days in advance. <br />(f) The applicant shall also post a sign on the subject property, and <br />directional signs posted at locations to be determined by Planning Staff. <br />The signs shall measure no more than nine square feet in area and no <br />less than four square feet in area, giving the contact information of the <br />County Planning Department, the proposed dates, times, and location of <br />the balloon test. The signs shall be posted to meet the same time limits <br />as provided for in the balloon test notification as stated above. <br />(3) Submittal Requirements <br />In addition to the information required herein as well as Section 2.7, the following <br />shall be submitted as part of the application: <br />(a) A site plan showing the following: <br />(i) The entire site (including property boundary lines) and size of all <br />existing structures within 500 feet of the site, <br />(ii) Existing and proposed structures on site, <br />(iii) The fall zone of the tower, <br />(iv) Existing and proposed topography at a contour interval of five <br />feet and <br />(v) Any officially designated floodways and floodplains, or the <br />presence of alluvial soils. <br />(b) Plans, and elevations for all proposed structures and descriptions of the <br />color and nature of all exterior material, along with the make, model, and <br />manufacturer of the proposed structure, maximum antenna heights, and <br />power levels. <br />(c) A Landscape and Tree Preservation Plan drawn at the same scale as <br />the site plan, showing the existing and proposed trees, shrubs, ground <br />cover and other landscape materials. This plan shall minimize adverse <br />visual effects of wireless telecommunications support structures and <br />29
The URL can be used to link to this page
Your browser does not support the video tag.