Orange County NC Website
9 <br />for the purpose of maintaining coristructive communications with the neighbors and to offer <br />a planned forum in which neighbors might ask questions about American Stone Company's <br />operation. <br />38. OWASA shall provide a special forum for citizens who live in the area of the quarry to <br />speak with the. OWASA Board of Directors about their concerns. <br />39. Operations associated with the extraction of earth materials and the reclamation .of the <br />property at the conclusion of mining will be in conformance with the standards set out in <br />Section 8.8.1.2 of the Ordinance, Mining Permit # 68-02 as modified and the approved <br />. Reclamation Plan filed in accordance with Mining Permit #6$-02. In the event of any <br />.inconsistency between the Ordinance and the Mining Permit, the stricter requirements shall <br />control. <br />40: A security fence of at least 6' in height shall be installed around the entire circumference of <br />the. open pit area. <br />41. Berms consisting of spoil and by products from operations shall be located as shown on the <br />approved site plan and shall not reach a height greater than 40' above.the original contour <br />and shall. not be graded sa that the vertical slope exceeds the material's natural angle of <br />repose. <br />42. Applicants shall submit operational reports to the County Manager, or designee, on an <br />annual basis detailing the amounts of materials extracted, extent of extractive area, depth <br />of extractive area and ground water test boring to the County. <br />43. A .landscape plan, showing buffers, berm cross-sections and planting materials, shall be <br />.submitted prior to the Planning Board recommendation and Board of County Commissioner <br />approval of the Special Use Permit. <br />44. If any condition of the Special Use Permit shall be held invalid or void, then the permit itself <br />- -- - - ---.shah- be void aria o~. no._errect:_ _ ...._- ~.._ - .: ~ _ ... -.~__.. _..-.. ~..____ .~ -... .. - - - <br />45:The petition to close existing Bethel Hickory Grove Church Road (SR 1104) shall not be <br />considered until the relocation and construction of the new SR 1104 is complete and <br />accepted by NCDOT. <br />46. Prior to submittal of the Bethel Hickory Grove Church Road (SR 1104) construction <br />drawings to NCDOT, the Orange County Erosion Control shall review and approve an <br />erosion control plan. <br />47. A 10,0-feet Type F buffer shall be retained/installed around the entire perimeter of the <br />petitioned site. <br />48. A sequence of events indicating the intended schedule of construction and quarrying <br />shall be prepared prior to Planning Board recommendation to the Board of County <br />Commissioners. <br />