Orange County NC Website
An additional $1,142,000 was provided for the project from future impact fees to <br />complete the acquisition of the Glover property and that figure has been included in the <br />summazy provided below, <br />An additional $500,000 dollazs has been allocated to the project by (1) the dedication of <br />the state sales tax refund for the project, $450,000, and (2) the dedication of the $50,000 <br />from the Department of Transportation back into the building fund, This additional <br />revenue will reduce the amount of funding required from the County Commissioners. <br />Summary <br />The following spreadsheet highlights the additional funding required to complete the high <br />schooh <br />Total Bullding <br />Multi-Prime Contract <br />General Contractor $23,650,000 <br />_ <br />HVAC ~ $2,872,352 <br />Plumbing _ $1,719,410 <br />Electrical $1,840,241 <br />Sub Total $30,082,003 <br />Fees $2,162,500 <br />Non•Personnel Start Up $500,000 <br />Technology $1,000,000 <br />Movable Furniture ~ $800,000 <br />Contingency $750,000 <br />Land $3,531,697 <br />Total Contract $38,626,200 <br />Funding <br />Interiocal Agreement $27,600,000 <br />Addendum "B" $1,900,000 <br />Addendum "B° Transportation ~ $300,000 <br />Additional Funding for Land ~ $1,142,000 <br />Sales Tax/Bus Refund $500,000 <br />Total $37,642,000 <br />Contract ~ $36,626,200 <br />Additional Funding Required $71a4200 <br />Percent Overage from 31,642k 23% <br />Percent Overagefrom 30,000k 24% <br />The additional funding required to complete high school #3 above and beyond the <br />existing available furiding is $7,184,200, This represents a 23% overage from available <br />funding and a 24% overage from the original $30,000,000 amount. This compares to the <br />19% overage Orange County Schools experienced with their middle school. This funding <br />level would provide a complete school with an auditorium, full fields and tennis courts. <br />