Browse
Search
Agenda - 04-26-2005-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 04-26-2005
>
Agenda - 04-26-2005-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:49:41 AM
Creation date
8/29/2008 10:16:58 AM
Metadata
Fields
Template:
BOCC
Date
4/26/2005
Document Type
Agenda
Document Relationships
Minutes - 20050426
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~'"°~- ®r~nge ~Courrtp ~c~jool~ <br />~~ ~~ o+ 200 ~a~t ding street <br />_~ ~i[l~~or0ug~j, ~~C 27278 <br />~?4 <br />w~/ <br />-~ i~r! <br />.; <br />Dr. Shirley Carraway <br />Superintendent <br />April 21, 2005 <br />Mr. John Link, County Manager <br />Orange County Board of County Commissioners <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />Dear Mr. Link and County Commissioner Members: <br />(919) 732-8126 Telephone <br />(919) 732-8120 Fax <br />www.orange.lcl2.nc.us <br />lrr preparation for the joint mee$ing of the Board of County Commissioners, the Orange County Schools' <br />Board of Education and the Chapel Hill-Carrboro City Schools' Board of Education, I submit the <br />following update on the two items scheduled on the agenda. <br />Update on Orange County Schools' Middle School #3 <br />The groundbreaking occurred on November 30, 2004. The project was bid in two parts: (1) Early Site- <br />worlc Package, with bids opened October 12, 2004; and (2) Building Construction Package, with bids <br />opened December 7, 2004. The Pre-Construction Conference was conducted on February 14, 2005, <br />which was attended by all project managers and field superintendents for each contractor on the project. <br />All contractor bonds have been received. <br />The Eazly Site-work phase of the project was completed on March 24, 2005, one week ahead of the <br />originally scheduled completion date.. The general contractor for the Building Construction Phase of the <br />project, J.H. Allen, began work on March 28, 2005. The building pad and panting lots have been staked- <br />out, and foundation rebaz has been set and concrete poured. <br />Additionally, the entire project is balanced between the school site and the soccer complex, which means <br />that no additional fill material was required. Weekly coordination meetings (with school district and <br />county representation present) have been held on-site since the start of the Early Site-work phase and will <br />continue until the project is completed. <br />Currently, there are three pending issues in various states of resolution: 1) the driveway locations for the <br />school and soccer complex require NCDOT approval in order to meet sight-distance requirements; 2) the <br />projected completion date for the sewer/water project is August 2006; and 3) the path for the Duke Pawer <br />transmission lines into the site requires an adjustment, which the school district nor the county is <br />responsible for financing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.