Orange County NC Website
DocuSign Envelope ID: 1 BDDA043- 9DAF -40E8- 8038 -31 C438360016 <br />- 120 "h - 21b <br />INSTALL LOCATION: <br />144 E. Margaret Lane <br />Hillsborough, NC27278 <br />10.1 Aluminum White .063" - <br />10.2 U- Channel 1 Oft 2lbs Galvanized <br />11 Sign Type: F - Projecting Flag Mount Wall Signs 3 $76.5967 <br />$229.79 <br />Projecting Flag-Mount Wall sign Dimensions: 7h 18.5 "wADA 1/16" RM China Blue 321 -302 Backerpouble <br />Sided Direct Digital Print Verbiage <br />(1) County Attorney /Human Rights and Resources (1st Floor) - Mount Using New Projecting Stand -offs (Line <br />Item 1 2)(1) Human Resources (Verbiage Changing) (1st Floor) - Mount Using Existing Projecting Stand- offs(1) <br />County Manager (2nd Floor) - Mount Using Existing Projecting Stand -offs <br />11.1 1/8" ADA Single Ply - <br />12 Projecting Grip -Mount Stand -offs 2 $12.50 <br />$25.00 <br />Projecting Flag -Mount Stand -offs for 1st Floor "County Attorney /Human Rights" Sign <br />12.1 Standoff (each) - Under 1" - state diam, color, depth - <br />13 Installation / Trip Charge 1 $2,345.50 <br />$2,345.50 <br />Installation Location: <br />200 S. Cameron St <br />Hillsborough, NC 27278 <br />13.1 Installation - 2 People, Standard (no bucket truck) - Post and Panel Install <br />13.2 Installation - 2 People, Standard (no bucket truck) - ADA Signs <br />13.3 Installation - 2 People, Standard (no bucket truck) - Hanging Flag <br />Signs /Hanging Lobby Sign Vinyl Replacement <br />13.4 Trip Charge - In State - Trip Charges <br />13.5 Installation - 2 People, Standard (no bucket truck) - Reserved Parking Signs <br />& U- Channel Posts <br />Subtotal: <br />$8,613.90 <br />TURNAROUND TIMES: Taxes: <br />$646.04 <br />Standard turnaround time for quick turn signage orders is 5 -7 business days. Grand Total: <br />$9,259.94 <br />Custom fabricated signs require a longer production cycle and may take as long <br />as 4 to 6 weeks or longer depending on the complexity, the quantity of signs <br />ordered, and the scope of the project. If your sign requires permitting, we do not <br />begin fabrication until we have an approved permit from your town's planning <br />department. <br />Rush fees are available on quick turn signage made in our main store fabrication <br />department to expedite an order upon request. Please ask your sales <br />representative for details. <br />Signature: <br />The above - mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do all the work specified. Payment will be made as outlined above <br />Date: <br />Choose DesignElement for quick turn signs to multi phase developments, digital pylon signs, entry monuments, and more! <br />Generated On: 8/2/2018 11:32 AM Page 4 of 4 <br />