Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 237700 - VIBRATION AND SEISMIC CONTROLS FOR HVAC <br />3.4 FIELD QUALITY CONTROL <br />A. Perform tests and inspections. <br />B. Tests and Inspections: <br />1. Provide evidence of recent calibration of test equipment by a testing agency acceptable to authorities <br />having jurisdiction. <br />2. Schedule test with Owner, through Architect, before connecting anchorage device to restrained <br />component (unless postconnection testing has been approved), and with at least seven days' advance <br />notice. <br />3. Obtain Architect's approval before transmitting test loads to structure. Provide temporary load - <br />spreading members. <br />4. Test at least four of each type and size of installed anchors and fasteners selected by Architect. <br />5. Test to 90 percent of rated proof load of device. <br />6. Measure isolator restraint clearance. <br />7. Measure isolator deflection. <br />8. If a device fails test, modify all installations of same type and retest until satisfactory results are <br />achieved. <br />C. Remove and replace malfunctioning units and retest as specified above. <br />D. Prepare test and inspection reports, certified by Professional Engineer who provided Delegated Design. <br />3.5 ADJUSTING <br />A. Adjust isolators after piping system is at operating weight. <br />B. Adjust limit stops on restrained spring isolators to mount equipment at normal operating height. After <br />equipment installation is complete, adjust limit stops so they are out of contact during normal operation. <br />C. Adjust active height of spring isolators. <br />D. Adjust restraints to permit free movement of equipment within normal mode of operation. <br />END OF SECTION 237700 <br />Reece, Noland & McElrath, Inc. 237700-3 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.