Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 237690 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT <br />J. Install building attachments within concrete slabs or attach to structural steel. Install additional <br />attachments at concentrated loads, including valves, flanges, and strainers, NPS 2 -1/2 and larger <br />and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts <br />to forms and install reinforcing bars through openings at top of inserts. <br />K. Load Distribution: Install hangers and supports so piping live and dead loads and stresses from <br />movement will not be transmitted to connected equipment. <br />L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and so maximum pipe <br />deflections allowed by ASME B31.1 (for power piping) and ASME B31.9 (for building services piping) <br />are not exceeded. <br />M. Insulated Piping: Comply with the following: <br />1. Attach clamps and spacers to piping. <br />a. Piping Operating above Ambient Air Temperature: Clamp may project through <br />insulation. <br />b. Piping Operating below Ambient Air Temperature: Use thermal- hanger shield insert <br />with clamp sized to match OD of insert. <br />C. Do not exceed pipe stress limits according to ASME B31.1 for power piping and <br />ASME B31.9 for building services piping. <br />2. Install MSS SP -58, Type 39, protection saddles if insulation without vapor barrier is indicated. <br />Fill interior voids with insulation that matches adjoining insulation. <br />3. Install MSS SP -58, Type 40, protective shields on cold piping with vapor barrier. Shields shall <br />span an arc of 180 degrees. <br />4. Shield Dimensions for Pipe: Not less than the following: <br />a. NPS 1/4 to NPS 3 -1/2: 12 inches long and 0.048 inch thick. <br />b. NPS 4: 12 inches long and 0.06 inch thick. <br />C. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick. <br />d. NPS 8 to NPS 14: 24 inches long and 0.075 inch thick. <br />e. NPS 16 to NPS 24: 24 inches long and 0.105 inch thick. <br />5. Pipes NPS 8 and Larger: Include wood inserts. <br />6. Insert Material: Length at least as long as protective shield. <br />7. Thermal- Hanger Shields: Install with insulation same thickness as piping insulation. <br />3.3 EQUIPMENT SUPPORTS <br />A. Fabricate structural -steel stands to suspend equipment from structure overhead or to support <br />equipment above floor. <br />B. Grouting: Place grout under supports for equipment and make smooth bearing surface. <br />C. Provide lateral bracing, to prevent swaying, for equipment supports. <br />3.4 METAL FABRICATIONS <br />A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports. <br />B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop <br />welded because of shipping size limitations. <br />C. Field Welding: Comply with AWS D1.1 procedures for shielded metal arc welding, appearance and <br />quality of welds, and methods used in correcting welding work, and with the following: <br />1. Use materials and methods that minimize distortion and develop strength and corrosion <br />resistance of base metals. <br />2. Obtain fusion without undercut or overlap. <br />3. Remove welding flux immediately. <br />4. Finish welds at exposed connections so no roughness shows after finishing and contours of <br />welded surfaces match adjacent contours. <br />Reece, Noland & McElrath, Inc. 237690-6 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.