Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 237690 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT <br />1. Steel Pipe- Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation <br />that matches adjoining insulation. <br />2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to <br />prevent crushing insulation. <br />3. Thermal- Hanger Shield Inserts: For supporting insulated pipe. <br />K. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system <br />Sections, install the following types: <br />1. Spring Cushions (MSS Type 48): For light loads if vertical movement does not exceed 1 -1/4 <br />inches. <br />2. Spring- Cushion Roll Hangers (MSS Type 49): For equipping Type 41 roll hanger with <br />springs. <br />3. Variable- Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability <br />factor to 25 percent to absorb expansion and contraction of piping system from base support. <br />L. Comply with MSS SP -69 for trapeze pipe hanger selections and applications that are not specified in <br />piping system Sections. <br />M. Comply with MFMA -102 for metal framing system selections and applications that are not specified in <br />piping system Sections. <br />N. Use powder- actuated fasteners or mechanical- expansion anchors instead of building attachments <br />where required in concrete construction. <br />3.2 HANGER AND SUPPORT INSTALLATION <br />A. Steel Pipe Hanger Installation: Comply with MSS SP -69 and MSS SP -89. Install hangers, supports, <br />clamps, and attachments as required to properly support piping from building structure. <br />B. Trapeze Pipe Hanger Installation: Comply with MSS SP -69 and MSS SP -89. Arrange for grouping <br />of parallel runs of horizontal piping and support together on field- fabricated trapeze pipe hangers. <br />1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install <br />intermediate supports for smaller diameter pipes as specified above for individual pipe <br />hangers. <br />2. Field fabricate from ASTM A 36/A 36M, steel shapes selected for loads being supported. <br />Weld steel according to AWS D1.1. <br />C. Metal Framing System Installation: Arrange for grouping of parallel runs of piping and support <br />together on field - assembled metal framing systems. <br />D. Thermal- Hanger Shield Installation: Install in pipe hanger or shield for insulated piping. <br />E. Fastener System Installation: <br />1. Install powder- actuated fasteners in concrete after concrete is placed and completely cured. <br />Use operators that are licensed by powder- actuated tool manufacturer. Install fasteners <br />according to powder- actuated tool manufacturer's operating manual. <br />2. Install mechanical- expansion anchors in concrete after concrete is placed and completely <br />cured. Install fasteners according to manufacturer's written instructions. <br />F. Install hangers and supports complete with necessary inserts, bolts, rods, nuts, washers, and other <br />accessories. <br />G. Equipment Support Installation: Fabricate from welded - structural -steel shapes. <br />H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to <br />permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, <br />expansion loops, expansion bends, and similar units. <br />Install lateral bracing with pipe hangers and supports to prevent swaying. <br />Reece, Noland & McElrath, Inc. 237690-5 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.