Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />Orange County Board of Elections <br />208 South Cameron Street <br />Hillsborough, NC 27278 <br />August 8, 2018 <br />GENERAL CONDITIONS <br />• Site supervision <br />• Project management <br />• Dumpsters <br />• Daily clean up <br />• Final clean. <br />• Permit <br />Contents <br />Pack out, perform mold clean, third party post remediation verification (PRV) and pack in. Lump <br />sum amount $59,723.00 <br />HVAC Demo <br />Evacuate refrigerant from all units, remove related electrical, condensing units, air handlers, duct <br />work and seal all penetrations through floor and ceiling. Lump sum amount $38,714.00 <br />Ceiline and Insulation <br />Remove existing 2x4 lay -in ceiling, install R -38 unfaced insulation between bar joists of first floor <br />ceiling, secure with wire, install new 2x4 standard lay -in ceiling, install tie wires on existing <br />fixtures and secure fixture to grid per code. Lump Sum amount $83,812.00 <br />LITt TITTWIRUMI T <br />Perform mold remediation of first floor and third party post remediation verification (PRV). Lump <br />sum amount $73,600.00 <br />HVAC <br />Furnish labor and materials on a time and material basis with a not to exceed of $135,000 for <br />installation of owner furnished HVAC equipment per construction drawings prepared by RN &M <br />(Sheet M.01, M.02, M,03, M.04, M1.1, M1.2, M1.3, M2.1, E1.0, E2.0, dated 5/72017, and <br />Mechanical Specifications dated 5,14/2018, and includes all roofing work associated with the <br />HVAC installation) <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.