Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 237000 - PENETRATION FIRESTOPPING <br />PART 3 - EXECUTION <br />3.1 THROUGH - PENETRATION FIRESTOP SYSTEM INSTALLATION <br />A. General: Install through - penetration firestop systems to comply with Part 1 "Performance <br />Requirements" Article and with firestop system manufacturer's written installation instructions and <br />published drawings for products and applications indicated. <br />B. Install forming/damming /backing materials and other accessories of types required to support fill <br />materials during their application and in the position needed to produce cross - sectional shapes and <br />depths required to achieve fire ratings indicated. <br />1. After installing fill materials and allowing them to fully cure, remove combustible forming <br />materials and other accessories not indicated as permanent components of firestop systems. <br />C. Install fill materials for firestop systems by proven techniques to produce the following results: <br />1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating <br />items as required to achieve fire - resistance ratings indicated. <br />2. Apply materials so they contact and adhere to substrates formed by openings and penetrating <br />items. <br />3. For fill materials that will remain exposed after completing Work, finish to produce smooth, <br />uniform surfaces that are flush with adjoining finishes. <br />3.2 FIELD QUALITY CONTROL <br />A. Where deficiencies are found, repair or replace through- penetration firestop systems so they <br />comply with requirements. <br />B. Proceed with enclosing through- penetration firestop systems with other construction only after <br />inspection reports are issued and firestop installations comply with requirements. <br />END OF SECTION 237000 <br />Reece, Noland & McElrath, Inc. 237000-3 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.