Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 236000 - COMMON WORK RESULTS FOR HVAC <br />C. Replace all air filters at least weekly and as required during operation to maintain air handling systems and <br />equipment in clean condition, and immediately prior to occupancy. <br />D. Clean air handling systems (ducts, air handling units, coils, etc.) as required prior to occupancy. Ducts, air <br />handling units, coils, etc. shall have no dust or construction debris prior to occupancy. At the Architect, <br />Engineer, or Owner's discretion (prior to occupancy or after occupancy if conditions were "concealed" and <br />later found), ductwork, air handling units, coils, etc. shall be cleaned at the contractor's expense. If ductwork <br />is found to be dirty, a certified, independent duct cleaning service shall be utilized by the contractor to clean <br />ductwork. <br />The building permanent HVAC system is designed to provide comfort conditions in a fully occupied building, <br />under normal occupied conditions. Equipment and systems may not be adequate for construction operations <br />such as drying out floor slabs or maintaining temperature /relative humidity in a partially completed building. <br />Such use is for the contractor's convenience and at the contractor's risk. <br />The use of permanent HVAC systems during construction in no way relieves the contractor, subcontractors, or <br />manufacturers /suppliers of their responsibilities to provide full warranties from the warranty start date <br />established in the Contract Documents. <br />END OF SECTION 236000 <br />Reece, Noland & McElrath, Inc. 236000-15 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.