DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7
<br />SECTION 236000 - COMMON WORK RESULTS FOR HVAC
<br />Designer will stamp each submittal with an action stamp and will mark stamp appropriately to indicate
<br />action taken, as follows:
<br />a. Furnish as Submitted
<br />b. Furnish as Corrected: Incorporate comments marked on or attached to submittal.
<br />C. Revise and Resubmit: Major items of the submittal do not comply, requiring a resubmittal.
<br />N. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without review.
<br />O. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
<br />P. The Contractor is responsible for compliance with the Contract Documents, dimensions, details, coordination,
<br />and satisfactory performance of materials and equipment provided and installed.
<br />3.15 PRODUCT REQUIREMENTS
<br />A. Products: Items purchased for incorporating into the Work, whether purchased for Project or taken from
<br />previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and
<br />terms of similar intent.
<br />1. Basis -of- Design Product: Item identified by manufacturer's product name, make, and model number,
<br />used to establish the significant qualities related to type, function, dimension, in- service performance,
<br />physical properties, dimensions, and other characteristics for purposes of evaluating comparable
<br />products of other named manufacturers.
<br />2. Comparable Product: Product that is listed in the Contract Documents, or added by Addendum, and
<br />demonstrated and approved through submittal process, or where indicated as a product substitution, to
<br />have the indicated qualities related to type, function, dimension, in- service performance, physical
<br />properties, appearance, and other characteristics that equal or exceed those of specified or basis -of-
<br />design product.
<br />3. Owner- preferred Alternate Product: Product that is listed in the Contract Documents, and for which an
<br />Alternate Bid price is submitted. When an Alternate Bid item is accepted in the Contract, no
<br />substitutions will be allowed.
<br />4. Substitutions: Changes in products, materials, equipment, and methods of construction from those
<br />required by the Contract Documents and proposed by Contractor after award of Contract.
<br />5. New Products: Items that have not previously been incorporated into another project or facility, except
<br />that products consisting of recycled- content materials are allowed, unless explicitly stated otherwise.
<br />Products salvaged or recycled from other projects are not considered new products.
<br />B. Comparable Product Requests: Submit three copies of each request for consideration, at least 10 days prior
<br />to receipt of bids, for products not listed in the Contract Documents. Identify product or fabrication or
<br />installation method to be replaced. Include Specification Section number and title and Drawing numbers and
<br />titles.
<br />1. Documentation: Show compliance with requirements for Comparable Products and the following, as
<br />applicable:
<br />a. Coordination information, including a list of changes or modifications needed to other parts of
<br />the Work and to construction performed by Owner and separate contractors that will be
<br />necessary to accommodate proposed product.
<br />b. Detailed comparison of significant qualities of proposed product with those of the Work
<br />specified. Significant qualities may include attributes such as performance, weight, size,
<br />durability, visual effect, and specific features and requirements indicated.
<br />C. Product Data, including drawings and descriptions of products and fabrication and installation
<br />procedures.
<br />2. Designer's Action: If necessary, Designer will request additional information or documentation for
<br />evaluation. Designer will notify Contractor of approval or rejection of proposed comparable product
<br />request.
<br />a. Form of Approval: Addition of the item to the list of Comparable Products by Addendum, prior
<br />to receipt of bids.
<br />b. Use product specified if Designer cannot make a decision on use of a comparable product
<br />request within time allocated.
<br />C. General Product Requirements: Provide products that comply with the Contract Documents, that are
<br />undamaged and, unless otherwise indicated, that are new at time of installation.
<br />1. Provide products complete with accessories, trim, finish, fasteners, features, options, and other items
<br />needed for a complete installation and indicated use and effect, and as required or recommended by
<br />Reece, Noland & McElrath, Inc. 236000-7 Orange County Board of Elections
<br />Orange Co., NC 05/04/18