Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 236000 - COMMON WORK RESULTS FOR HVAC <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. This Section includes the following: <br />1. General provisions. <br />2. Scope. <br />3. Permits and Fees. <br />4. Visit to Job Site. <br />5. Workmanship. <br />6. Drawings and Specifications. <br />7. Tests. <br />8. Allowance for added work. <br />9. Incidental construction work. <br />10. Access Doors. <br />11. Supervision. <br />12. Electrical work by others. <br />13. Adaptation of work to existing conditions. <br />14. Submittal procedures. <br />15. Product requirements. <br />16. Closeout procedures. <br />17. Operation and Maintenance Manuals. <br />18. As -built Documents. <br />19. Demonstration and Training. <br />20. Warranty. <br />21. Piping materials and installation instructions common to most piping systems. <br />22. Dielectric fittings. <br />23. Mechanical sleeve seals. <br />24. Sleeves. <br />25. Escutcheons. <br />26. Grout. <br />27. Roof pipe and equipment supports. <br />28. Equipment installation requirements common to equipment sections. <br />29. Concrete bases. <br />30. HVAC system use during construction. <br />PART 2 - NOT APPLICABLE <br />PART 3 - EXECUTION <br />3.1 GENERAL PROVISIONS <br />A. This Contractor's attention is directed to the requirements of Instructions to Bidders, General Conditions and <br />Supplementary General Conditions as bound in the specifications which apply in full to the HVAC work. <br />B. Where the requirements of this Division conflict with other articles in these Specifications, the Contractor shall <br />utilize the more stringent method. <br />3.2 SCOPE <br />A. Provide all labor, materials, tools, equipment, and transportation, and perform all operations necessary for and <br />reasonably incidental to proper execution and completion of all "HVAC" work, whether specifically mentioned <br />or not, all as indicated, specified herein, and /or implied thereby to carry out the apparent intent thereof. <br />Reece, Noland & McElrath, Inc. 236000-1 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.