Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />b. In the event that public funds are unavailable and not appropriated for the performance of <br />Owner's obligations under this Agreement, then this Agreement shall automatically expire <br />without penalty to Owner immediately upon written notice to Contractor of the unavailability <br />and non - appropriation of public funds. It is expressly agreed that Owner shall not activate this <br />non - appropriation provision for its convenience or to circumvent the requirements of this <br />Agreement, but only as an emergency fiscal measure during a substantial fiscal crisis. <br />In the event of a change in the Owner's statutory authority, mandate and/or mandated <br />functions, by state and /or federal legislative or regulatory action, which adversely affects <br />Owner's authority to continue its obligations under this Agreement, then this Agreement shall <br />automatically terminate without penalty to Owner upon written notice to Contractor of such <br />limitation or change in Owner's legal authority. <br />7. NOTICES <br />Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, <br />return receipt requested to the following: <br />Owner: <br />Orange County <br />Attn: Jeff Thompson <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />8. MISCELLANEOUS <br />Contractor: <br />Sasser Companies <br />Attn: Kevin Sasser <br />P.O. Box 10 <br />Whitsett, NC27377 <br />a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br />and Obligations imposed by state, federal or local law, rules, regulations and ordinances. <br />b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br />duty granted them under the Contract Documents, nor shall any act or failure to act constitute <br />any approval except as specifically agreed in writing. <br />The Work shall be tested and inspected as required by the Contract Documents and as required <br />by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br />federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br />Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br />conducted by an independent third party at the expense of the Owner. Delays related to any of <br />the aforementioned tests and inspections shall not be grounds for delaying the completion of <br />the work. If any such tests and inspections reveal deficiencies in the Work such that the Work <br />does not comply with terms or requirements of the Contract Documents and/or the <br />requirements of any code or law the Contractor is solely responsible for the cost of bringing <br />such deficiencies into compliance with the terms of the Contract Documents and/or any code <br />or law. <br />d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner <br />reject any portion of the Work for failing to comply with the Contract Documents Contractor <br />shall immediately, at Contractor's expense, correct the Work. Any such rejection may be <br />made before or after substantial completion. If applicable, any additional expense borne by the <br />Designer under this section shall be paid at Contractor's expense. <br />Revised 10/17 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.