Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />f. If activities related to the performance of this Agreement require specific licenses, <br />certifications, or related credentials Contractor represents that it and/or its employees, agents <br />and subcontractors engaged in such activities possess such licenses, certifications, or <br />credentials and that such licenses certifications, or credentials are current, active, and not in a <br />state of suspension or revocation. <br />g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br />skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br />shall be solely responsible for the means, methods, techniques, sequences and procedures of <br />construction, and for safety precautions and programs in connection with the Work. The <br />Contractor shall be responsible to see that the finished Work complies accurately with the <br />Contract Documents. <br />h. The Contractor shall appoint a competent Project Manager with general authority to manage <br />the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br />the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br />shall not be replaced without prior written approval by the Designer or by the Owner if a <br />Designer is not retained for the Project. <br />i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br />unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br />Contract Price if and when directed by the Designer. <br />j. The Contractor shall attend all progress conferences and all other meetings or conferences. <br />The Contractor shall be represented at these progress conferences by a representative having <br />the authority of the Project Manager and by such other representatives as the Designer may <br />direct. <br />k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br />Contractor. Any Work in which untested materials are used without approval or written <br />permission of the Owner and/or Designer shall be removed and replaced at Contractor's <br />expense. <br />5. PAYMENT & TAXES <br />a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br />Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not -to- <br />exceed Three Hundred Ninety Thousand, Eight Hundred Forty Nine Dollars ($390,849.00) <br />($59,723- contents; $73,600 - Structure Cleaning; $38,714- Ductwork/HVAC demo; $83,812 - <br />Ceiling Insulation; $135,000 -HVAC Installation/ Associated Roof Work). Not later than the <br />fifth (5th) day of each calendar month the Contractor shall submit to the Owner's <br />Representative, generally the Designer if a Designer is retained on the Work, a Request for <br />Payment for work done during the previous calendar month. <br />(i) The Request for Payment shall be in form of a standardized invoice or AIA Document <br />G702 -703 appropriately addressed to Owner's Representative at Orange County, PO <br />Box 8181, Hillsborough NC 27278 and shall show substantially the value of work done <br />during the previous calendar month. <br />Revised 10/17 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.