Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239700 - LOUVERS AND VENTS <br />B. Surface Preparation: Clean surfaces with nonpetroleum solvent so surfaces are free of oil and other <br />contaminants. After cleaning, apply a conversion coating suited to the organic coating to be applied <br />over it. Clean welds, mechanical connections, and abraded areas and repair according to <br />ASTM A 780. <br />C. Baked - Enamel or Powder -Coat Finish: Immediately after cleaning and pretreating, apply <br />manufacturer's standard 2 -coat, baked -on finish consisting of prime coat and thermosetting topcoat, <br />with a minimum dry film thickness of 1 mil for topcoat. Comply with coating manufacturer's written <br />instructions for applying and baking to achieve a minimum dry film thickness of 2 mils. <br />1. Color and Gloss: As selected by Architect from manufacturer's full range. <br />2.8 STAINLESS -STEEL SHEET FINISHES <br />A. Repair sheet finish by grinding and polishing irregularities, weld spatter, scratches, and forming <br />marks to match surrounding finish. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Locate and place louvers and vents level, plumb, and at indicated alignment with adjacent work. <br />B. Use concealed anchorages where possible. Provide brass or lead washers fitted to screws where <br />required to protect metal surfaces and to make a weathertight connection. <br />C. Provide perimeter reveals and openings of uniform width for sealants and joint fillers, as indicated. <br />D. Repair damaged finishes so no evidence remains of corrective work. Return items that cannot be <br />refinished in the field to the factory and refinish entire unit or provide new units. <br />E. Protect galvanized and nonferrous -metal surfaces that will be in contact with concrete, masonry, or <br />dissimilar metals from corrosion and galvanic action by applying a heavy coating of bituminous paint. <br />END OF SECTION 239700 <br />Reece, Noland & McElrath, Inc. 239700-4 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.