Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239500 - MULTI - INDOOR VRV SYSTEM <br />XXX HVAC Floor Plan <br />XXX HVAC Refrigerant Piping Plan <br />XXX HVAC Refrigerant Piping /Controls Details <br />XXX HVAC Control Wiring Plan <br />XXX HVAC Details <br />XXX HVAC Schedules <br />XXX Electrical HVAC Power Plan (with Risers, Panel Schedules, etc.) <br />XXX Plumbing HVAC Drain Piping Plan <br />The supplier shall draft all piping circuits, components, overall building control schemat- <br />ic, detailed control wiring diagrams, power wiring diagrams, system details and sched- <br />ules for their system. The drawings shall convey all requirements to successfully install <br />the alternate equipment suppliers system. <br />Provide (2) drawing package sets. Provide (1) drawing package in electronic format <br />(.dxf files) on CD. <br />The submitted documents shall be complete system designs and show no less infor- <br />mation than the HVAC equipment/controls contract bid documents. The equipment <br />supplier shall bear all costs for: producing drawings / documentation as required <br />in these specifications; added / revised electrical conduit, wiring, breakers, and <br />panels as required to meet power requirements; added / revised mechanical pip- <br />ing, wiring, devices, etc.; added / revised plumbing piping, drains, etc. - as re- <br />quired for a complete system. <br />1.03 The equipment supplier shall submit as part of the equipment data package outdoor unit <br />data sheets. Data sheets to include the following: <br />Capacities: Cooling <br />Cooling (Btu /h) <br />Cooling Input Power <br />(kW) <br />Capacities: Heating <br />Heating (Btu /h) <br />Heating Input Power <br />(kW) <br />Operating Temperature Range: <br />Cooling <br />Heating <br />Power Supply: <br />Maximum Circuit Amps (MCA) <br />Maximum Fuse Amps (MFA) <br />Maximum Starting Current (MSC) <br />Total Over Current Amps (TOCA) <br />Outdoor Fan Motor <br />Reece, Noland & McElrath, Inc. 239500-81 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.