Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239500 - MULTI - INDOOR VRV SYSTEM <br />• Setpoint <br />xxi. Filter sign reset for indoor units <br />xxii. Forced indoor units off. <br />6) The Building Management System may choose to monitor and control <br />the following BACnet objects linked to iTM control logic: <br />i. Enable /Disable iTM Schedule operation. <br />ii. Enable /Disable iTM Auto Changeover Operation. <br />iii. Set Timed Override Minutes. <br />• Monitor and configure timer extension on iTM (30, 60, 90, <br />120, 150, 180 minutes) <br />iv. System forced off <br />• Enable /Disable all emergency stop programs that are <br />registered on the iTM. <br />7) Schedule <br />The BMS shall utilize iTM schedule function or support weekly schedule settings <br />through its programming. <br />i. BMS schedule shall support the indoor unit: <br />• Each scheduled event shall specify time and target group <br />address. <br />• Each scheduled event shall include Occupancy Mode, <br />Operation Mode, Occupied Cooling Setpoint, Occupied <br />Heating Setpoint, and Unoccupied cooling setpoint, Un- <br />occupied heating setpoint, Remote Controller On /Off <br />Permit/Prohibit, Remote Controller Mode Permit /Prohibit, <br />Remote Controller Setpoint Permit/Prohibit, and Timed <br />Override Enable. <br />• An override shall be provided for use enabling indoor unit <br />operation during the unoccupied period by the BMS pro- <br />gramming. <br />8) Auto Changeover <br />The BMS shall utilize iTM Auto changeover function or support auto - changeover <br />through its programming. <br />i. Auto - change shall provide changeover for both Heat Pump and <br />Heat Recovery systems based upon the group configurations. <br />This will allow the optimal room temperature to be maintained <br />by automatically switching the indoor unit's mode between Cool <br />and Heat in accordance with the room temperature and setpoint <br />temperature. <br />ii. Changeover shall change the operation mode of the indoor unit <br />that is set as the Changeover Master. The Changeover Master <br />indoor unit shall then change the operation mode of all indoor <br />unit groups daisy chained on the same D111-Net communication <br />bus to the same outdoor unit in the Heat Pump system or the <br />same branch selector box in the Heat Recovery system. <br />iii. Changeover to cooling mode shall occur when the room tem- <br />perature is great than or equal to the cooling setpoint <br />Reece, Noland & McElrath, Inc. 239500-78 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.