Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239500 - MULTI - INDOOR VRV SYSTEM <br />Model Number <br />Cooling <br />(Indoor 80 °F DB / 67 °F WB, <br />Outdoor 95 °F DB, 25 ft pipe length) <br />Heating <br />(Indoor 47 °F DB / 43 °F WB, <br />Outdoor 70 °F DB, 25 ft pipe length) <br />FXFQ07TVJU <br />7,500 <br />8,500 <br />FXFQ09TVJU <br />9,500 <br />10,500 <br />FXFQ12TVJU <br />12,000 <br />13,500 <br />FXFQ15TVJU <br />15,000 <br />16,500 <br />FXFQ18TVJU <br />18,000 <br />20,000 <br />FXFQ24TVJU <br />24,000 <br />27,000 <br />FXFQ30TVJU <br />30,000 <br />34,000 <br />FXFQ36TVJU <br />36,000 <br />40,000 <br />FXFQ48TVJU <br />48,000 <br />54,000 <br />C. Indoor Unit: <br />1. The Daikin indoor unit FXFQ_T shall be completely factory assembled <br />and tested. Included in the unit is factory wiring, piping, electronic propor- <br />tional expansion valve, control circuit board, fan motor thermal protector, <br />flare connections, condensate drain pan, condensate drain pump, con- <br />densate safety shutoff and alarm, self- diagnostics, auto - restart function, <br />3- minute fused time delay, and test run switch. <br />2. Indoor unit and refrigerant pipes will be charged with dehydrated air prior <br />to shipment from the factory. <br />3. Both refrigerant lines shall be insulated from the outdoor unit. <br />4. The round flow supply air flow can be field modified to 23 different airflow <br />patterns to accommodate various installation configurations including <br />corner installations. <br />5. Return air shall be through the concentric panel, which includes a resin <br />net, mold resistant, antibacterial filter. <br />6. The indoor units shall be equipped with a condensate pan with antibacte- <br />rial treatment and condensate pump. The condensate pump provides up <br />to 33 -1/2" of lift from bottom of unit to top of drain piping and has a built in <br />safety shutoff and alarm. <br />7. The indoor units shall be equipped with a return air thermistor. <br />8. The indoor unit will be separately powered with 208- 230V/1- phase /60Hz. <br />9. The voltage range will be 253 volts maximum and 187 volts minimum. <br />10. To save energy and optimize occupancy comfort, the indoor unit shall be <br />equipped with built in occupancy sensor and surface temperature sensor. <br />11. Supplied air shall be directed automatically by four individually controlled <br />louvers. <br />D. Unit Cabinet: <br />1. The cabinet shall be space saving and shall be located into the ceiling. <br />2. Four auto - adjusted louvers shall be available to choose, which include <br />standard, draft prevention and ceiling stain prevention. <br />3. The airflow of the unit shall have the ability to shut down outlets with mul- <br />tiple patterns allowing for simpler installation in irregular spaces. <br />4. Fresh air intake shall be possible by way of Daikin's optional fresh air in- <br />take kit. <br />5. A branch duct knockout shall exist for branch ducting of supply air. <br />6. The cabinet shall be constructed with sound absorbing foamed polysty- <br />rene and polyethylene insulation. <br />7. Optional high efficiency air filters are available for each model unit. <br />A. Fan: <br />Reece, Noland & McElrath, Inc. 239500-37 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.