Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239500 — MULTI - INDOOR VRV SYSTEM <br />1.07 WARRANTY <br />A. STANDARD LIMITED WARRANTY <br />1. Complete warranty details available from your local Daikin representative or at <br />www.daikincomfort.com. <br />2. Daikin North America LLC warrants original owner of the non - residential building, multi- <br />family residence or residence in which the Daikin products are installed that under normal <br />use and maintenance for comfort cooling and conditioning applications such products <br />(the "Products ") will be free from defects in material and workmanship. This warranty ap- <br />plies to compressor and all parts and is limited in duration to ten (10) years starting from <br />the "installation date" which is one of the two dates below: <br />a. The installation date is the date that the unit is originally commissioned, but no later <br />than 18 months after the manufacture date noted on the unit's rating plate. <br />b. If the date the unit is originally commissioned cannot be verified, the installation date <br />is three months after the manufacture date. <br />PART 2 PRODUCTS <br />2.01 MANUFACTURERS <br />A. DESIGN BASIS: <br />1. The HVAC equipment basis of design is Daikin North America. All bidders shall furnish <br />the minimum system standards as defined by the base bid model numbers, model fami- <br />lies or as otherwise specified herein (see Appendix A HVAC Equipment Alternate Gen- <br />eral Information). In any event, the contractor shall be responsible for all specified items <br />and intents of this document without further compensation. <br />2.02 HVAC SYSTEM DESIGN <br />A. SYSTEM DESCRIPTION: <br />1. The variable capacity heat recovery air conditioning system shall be a Daikin Variable <br />Refrigerant Volume Series (heat or cool model) system as specified. <br />2. The system shall consist of multiple evaporators, branch selector boxes, REFNET' joints <br />and headers, a three -pipe refrigeration distribution system using PID control and Daikin <br />VRV® condenser unit. <br />3. The condenser shall be a direct expansion (DX), air - cooled heat recovery, multi -zone air - <br />conditioning system with variable speed inverter driven compressors using R-41 OA re- <br />frigerant. <br />4. The condensing unit may connect an indoor evaporator capacity up to 200% of the con- <br />densing unit nominal capacity. All zones are each capable of operating separately with <br />individual temperature control. <br />Reece, Noland & McElrath, Inc. 239500-14 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.