Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239300 - HVAC POWER VENTILATORS <br />E. Belt- Driven Units: Motor mounted on adjustable base, with adjustable sheaves, enclosure <br />around belts within fan housing, and lubricating tubes from fan bearings extended to <br />outside of fan housing. <br />F. Fan Wheels: Aluminum, airfoil blades welded to aluminum hub. <br />G. Accessories: <br />1. Volume - Control Damper: Manually operated with quadrant lock, located in fan <br />outlet. <br />2. Companion Flanges: For inlet and outlet duct connections. <br />3. Fan Guards: 1/2- by 1 -inch mesh of galvanized steel in removable frame. Provide <br />guard for inlet or outlet for units not connected to ductwork. <br />4. Motor and Drive Cover (Belt Guard): Epoxy- coated steel. <br />2.5 MOTORS <br />A. Comply with requirements in Division 23 Section "Common Motor Requirements for <br />HVAC Equipment." <br />B. Enclosure Type: Totally enclosed, fan cooled. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Install power ventilators level and plumb. <br />B. Vibration- and seismic - control devices are specified in Division 23 Section "Vibration and <br />Seismic Controls for HVAC Piping and Equipment." <br />1. Secure vibration and seismic controls to concrete bases using anchor bolts cast in <br />concrete base. <br />C. Ceiling Units: Suspend units from structure; use steel wire or metal straps. <br />D. Support suspended units from structure using threaded steel rods. Vibration - control <br />devices are specified in Division 23 Section "Vibration and Seismic Controls for HVAC <br />Piping and Equipment." <br />E. Install units with clearances for service and maintenance. <br />F. Label units according to requirements specified in Division 23 Section "Identification for <br />HVAC Piping and Equipment." <br />G. Duct installation and connection requirements are specified in other Division 23 Sections. <br />Drawings indicate general arrangement of ducts and duct accessories. Make final duct <br />connections with flexible connectors. Flexible connectors are specified in Division 23 <br />Section "Air Duct Accessories." <br />H. Install ducts adjacent to power ventilators to allow service and maintenance. <br />I. Ground equipment and connect wiring according to Division 16 Sections. <br />Reece, Noland & McElrath, Inc. 239300-4 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.