Browse
Search
2018-425-E AMS - Sasser Companies Annex upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-425-E AMS - Sasser Companies Annex upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2018 1:51:04 PM
Creation date
8/24/2018 9:08:20 AM
Metadata
Fields
Template:
Contract
Date
8/7/2018
Contract Starting Date
8/7/2018
Contract Ending Date
9/7/2018
Contract Document Type
Agreement - Construction
Amount
$390,849.00
Document Relationships
R 2018-425 AMS - Sasser Companies BOE upfit
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9826C043- 4C32- 49CD- A4CC- DC28ABAB7CE7 <br />SECTION 239116 — NON -METAL DUCTS <br />Inlet connection to metal duct via fabric draw band with anchor patches as supplied by manu- <br />facturer. Anchor patches to be secured to metal duct via. zip screw fastener — supplied by <br />contractor. <br />Inlet connection includes zipper for easy removal / maintenance. <br />Lengths to include required intermediate zippers as specified by manufacturer. <br />System to include Adjustable Flow Devices to balance turbulence, airflow and distribution as <br />needed. Flow restriction device shall include ability to adjust the airflow resistance from 0.06 <br />— 0.60 in w.g. static pressure. <br />End cap includes zipper for easy maintenance. <br />Each section of the textile shall include identification labels documenting order number, sec- <br />tion diameter, section length, piece number, code certifications and other pertinent infor- <br />mation. <br />E. DESIGN PARAMETERS: <br />1. Textile air diffusers shall be designed from 0.25' water gage minimum to 3.1" maximum, with <br />0.5" as the standard. <br />2. Textile air diffusers shall be limited to design temperatures between 0 degrees F and 180 de- <br />grees F ( -17.8 degrees C and 82 degrees C). <br />3. System overall design; diameter, length, airflow, operating static pressure and dispersion shall <br />be designed or approved by the manufacturer. <br />4. Do not use textile diffusers in concealed locations. <br />5. Use textile air dispersion systems only for positive pressure air distribution components of the <br />mechanical ventilation system. <br />PART 3 — INSTALLATION <br />3.1 INSTALLATION OF TEXTILE AIR DISPERSION SYSTEM: <br />A. Install chosen suspension system in accordance with the requirements of the manufacturer. Instruc- <br />tions for installation shall be provided by the manufacturer with product. <br />3.2 CLEANING AND PROTECTION: <br />A. Clean air handling unit and ductwork prior to the DuctSox system unit -by -unit as it is installed. Clean <br />external surfaces of foreign substance which may cause corrosive deterioration of facing. <br />B. Temporary Closure: At ends of ducts which are not connected to equipment or distribution devices at <br />time of ductwork installation, cover with polyethylene film or other covering which will keep the system <br />clean until installation is completed. <br />C. If DuctSox systems become soiled during installation, they should be removed and cleaned following <br />the manufacturers standard terms of laundry. <br />END OF SECTION 239116 <br />Reece, Noland & McElrath, Inc. 239116-4 Orange County Board of Elections <br />Orange Co., NC 05/04/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.